A bill of materials is a list and the quantities of materials or components that make up a completed product. In many ways the BOM is a configuration log, without containing physical measures or dimensions of a product.
Heat and electricity are not typically included in the same bill. They are usually billed separately by utility companies.
Heating is not typically included in the electricity bill. Heating is usually a separate expense that is paid for separately, either through a gas bill or another heating source.
Heat is not typically included in the electric bill. Heating is often provided by a separate system, such as a furnace or boiler, which may run on electricity, gas, or oil. The cost of heating is usually reflected in a separate bill or utility payment.
Supplies & materials provided by physician over & above those usually included with office visit (list materials provided)
Service initiation charge is NOT included on a monthly water bill
A bill of materials is a list of materials and components used in a manufactured item, which are sometimes appended to an engineering diagram of the item.
Why the notion of profit is usually included in this definition
No, gas is typically not included in the electric bill. Gas and electricity are separate utilities and are billed separately.
Heat may or may not be included in the gas bill, depending on the specific terms of the billing agreement.
99070-Supplies and materials (except spectacles), provided by the physician over and above those usually included with the office visit or other services rendered (list drugs, trays, supplies, or materials provided)
Heat and gas may be included in the same bill depending on the type of heating system in your home.
Why the notion of profit is usually included in this definition