Z bus is using in fault analysis of power system..it represents how much impedance the network offers to the fault current.lower the impedence larger the fault current
You can increase load on a bus power system by increasing the bus active power demand ans reactive power demand.
For make a system balanced losses in power
a path through which power is transferred from generating station to consumers.
Bus Clock is based on the System Clock. In other terms Bus Clock is derived from system Clock. Bus Clock is usually half System Clock. (Busy Clock = System Clock / 2)
data bus, system bus and host bus.
A PU bus in the power system which has the constant voltage value and is connected to a generator. The extra required energy or excess energy in the power system is managed by connected generator to this bus.
You can increase load on a bus power system by increasing the bus active power demand ans reactive power demand.
From the Traces or Wires on the system bus that carry power.
Double bus bar is related to power control center (PCC). PCC is the main LT power distribution in any industrial establishment or large residential complex too. It basically an electrical panel with required number of incomer feeders and outgoing feeders. Power source like state power or captive power provide the incomers and outgoing feeders cater to the down stream power panels for further distribution( to MCC). Any PCC has one or more incomer and one or more outgoing feeder and bus isolators depending on the requirement. This PCC needs to have a bus bar to which the incomer gets connected and feeds the power to the bus and the outgoing feeders are connected to the bus bar to deliver the power down stream. This bus bar can be single bus bar system or double bus bar system. In a double bus bar system the two different power sources are connected to two different bus. Say one bus is for DG set power another bus is for SEB power. Both the buses can be charged simultaneously and can feed any outgoing feeders. The out going feeder have flexibility of getting the power either of the buses, but not simultaneously from both the buses. Double bus bar is more expensive compared to single bus bar system but more flexible, reliable.
For make a system balanced losses in power
false
True
the swing bus is selected bus that has a fictitious generator with a p.u magntiude and phase angle equal zero ..in the power flow calculations ,The extra required energy or excess energy in the power system is managed by the generator of this bus.( supply/absorb p&Q) In order to achieve the balance between the generation ,the losses and the load ( Pgeneration = Pload + Plosses) solution of the power flow system is achieved when swing bus equal nearly zero
front side Bus...(FSB) or System Bus
System bus, memory bus, front side bus (FSB), host bus, local bus, or external bus.
a path through which power is transferred from generating station to consumers.
False.