The work force for the Great Pyramid was most likely a mixed one of slaves and free workers. All the skilled, supervisory and administrative tasks would have been done by free workers. The slaves would have done heavy dangerous work such as quarrying, dragging the stones, putting them in place, extending and repairing the ramps used to raise the stones to the required level.
It is estimated that 20,000 to 30,000 workers would have been needed for the task.
Craftspeople such as masons, carpenters, ropemakers, surveyors and metal workers
Scribes who acted as administrators and project managers
Thousands of slaves to do all heavy laboring jobs. The slaves were naked too low in status to be given clothes.
If you're talking about the shape.. it would have to be square-based pyramid.
wut kind of question is that?
Limestone which was quarried locally
An Egyptian pyramids, I think. FAMILY FEUD: Name a kind of pyramid. Egyptian pyramid Food pyramid Pyramid scheme Cheerleader's pyramid $100,000 pyramid
the only one i know he ordered built was the Great Pyramid.
a triangular pyramid
depends on what kind of pyramid it is
The great pyramid was built over a period of 10-60 years (depending on the source), by Pharaoh Khufu (and his successors) around 2550 B.C. There is no evidence that this original and biggest Egyptian pyramid, was ever used, or ever intended to be used, as a tomb of any kind.
They used it to bury their kings, or pharaohs. They used it to build the pyramid for king Khufu
501 shrink to fit worked great for me
what kind of pyramid?
A square based pyramid.