The present London Bridge is a pre-stressed concrete box girder bridge.
The present London Bridge is a pre-stressed concrete box girder bridge.
The material used to build the bridge was wood and steel
Of prostitutes
The present London Bridge is built using pre-stressed concrete.
Reinforced concrete
Stone and steel.
cheese plastacine and gelatine
Pre-stressed concrete.
The current (1973) bridge is a prestressed concete box girder bridge.
Bricks concrete and steel.
11,000
The current London Bridge is a pre-stressed concrete box girder bridge.