Most apprenticeship programs last from 2 to 4 years, though some are only one year and some are five.
It seems there is some confusion in the question regarding the percentages. If Noah spent 45% of his total time working on the transmission, you can calculate that by multiplying his total hours (25) by 0.45. Therefore, Noah spent 25 hours * 0.45 = 11.25 hours working on the transmission.
MCE =value added time (process time)/throughput time. Basically this breaks down to the time spent actually working on the product divided by the time spent working on the product, time spent on inspecting the product, time spent on moving the product and time a product spend waiting to be worked on.
51% of the time, minus time spent in daycare.
Education. Because most of the children had begun schooling hence spent less time working in factories.
The components of Goldratt's production cycle time are processing time (actual time spent working on a product), inspection time (time spent checking the product for quality), queue time (time spent waiting in between production steps), and move time (time spent physically moving the product between workstations).
One of 13 children
they spent more time working than hunting
Peter fills out a time sheet every Friday. This week, Peter spent 27.5 hours out of 40 hours, or 0.6875 of his time, working on Project A. Which fraction is the best estimate of the time Peter spent on Project A?
He is not married. His passion and time is spent working with the kids at RCA!!
they spent there time singing songs and working but praying and hoping to be free
The fractional part of the hour spent doing math was a 1/4.
I would say that they work about 16 hours a day.