answersLogoWhite

0


Best Answer

Where there is a high degree of customer contact, and efficiency may become secondary to keeping customer waiting times to reasonable levels, so scheduling the workforce to meet demand becomes a priority. Having too few workers causes waiting lines to form, but having more workers than needed increases labor costs, which can have a substantial impact on profits, particularly in service systems where labor is the major cost involved.

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What problems not generally found in manufacturing systems do service systems present in terms of scheduling the use of resources?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Industrial Engineering

What are the problems that can occur with the welding activities and how these can be overcome?

Many problems can be experienced in welding including cracks, infusions and distortion. Generally these can be avoided by eliminating hydrogen, keeping temperature under control and controlling the atmospheric pressure of the environment.


What is job shop production?

One out of four production types. Products are running through various manufacturing processes according to customer’s specifications. Not all products go through the same path (area in the factory) of manufacturing. Usually low quantity is produced. Good for small-medium manufacturers. Basically, it allows flexibility in terms of switching between machines, methods, handling problems in production. This kind of production can be adjusted for several products that are highly customized. Order peaks are easy to handle – it is possible, for example, to add extra shift for a bottle neck machine. However, this production is expensive, requires complex control of production and materials and is suitable only for low quantity.


Steps in production planning and control?

a-planning,b-routing,c-scheduling,d-loading,e-dispatching,f-follow up,g-inspection1. PlanningThe first important step inis concerned with the careful preparation of production plans. Production plans determine what will be produced and where, at what type, by whom, and how. For detailed planning of operations, the relevant information may be obtained from several sources in the enterprise. Information about quantity and quality of products to be manufactured may be obtained from customers' orders and the sales budget, and information about production facilities may be obtained from the management and the engineering department. Thus, the planning function formulates production plans, and translates them into requirements for men, machinery and materials. Whatever be the planning period, helps in avoiding randomness in production, providing regular and steady flow of production activities, utilizing production facilities to its maximum for minimizing operating costs and meeting delivery schedules; coordinating various departments of the enterprise for maintaining proper balance of activities, and above all, providing the basis for control in the enterprise.2. RoutingThe next important function of production planning and control is routing which involves the determination of the path (i.e. route) of movement of raw materials through various machines and operations in the factory. "Routing includes the planning of where and by whom work shall be done, the determination of the path that work shall follow, and the necessary sequence of operations". To find this path, emphasis is placed on determining operating data, which usually includes planning of 'where' and 'by whom' work should be done, the determinations of the path that work shall follow, and the necessary sequence of operations. These operating data are contained in the standard process sheet which helps in making out a routing in the standard process sheet which helps in making out a routing chart showing the sequence of operations and the machines to be used. If the machine loan chart indicates the non-availability of certain machines, alternate routing may also be included on the routing chart. The most efficient routing may have to be compromised with the availability of the machines at a particular time. In other words, "routing establishes the operations, their path and sequence, and the proper class of machines and personnel required for these operations." From the above, it can be inferred that routing is one of the highly essential elements and prime considerations of production control because many production control functions are closely related processes and are dependent on routing functions. Thus, it is essential to solve the different problems concerning: appropriate personnel; ; and.4. SchedulingScheduling is planning the time element of production - i.e. prior determination of "when work is to be done". It consists of the starting and completion times for the various operations to be performed. In other words, scheduling function determines when an operation is to be performed, or when work is to be completed, the difference lies in the details of the scheduling procedure. To work out effectively, the scheduling, as a part of , determines the time when each operation called for on the route sheet is to be done on the specified machine in order to meet the desired delivery dates. Good control function directs not only the time that each particular operation should start but also indicates the progress of each manufacturing part, the amount of work ahead of each machine, and the availability of each machine for the assignment of new work. Schedules are of two types: Master schedule and Detailed schedule. Activities, if recorded on plant-wise basis, would be preparing master schedule, while mere detailed schedules are employed to plan the manufacturing and assembly operations required for each product.5. Dispatching* Dispatching is the part of production control that translates the paper - work into actual production. It is the group that coordinates and translates planning into actual production. Dispatching function proceeds in accordance with the details worked out under routing and scheduling functions. As such, dispatching sees to it that the material is moved to the correct work place, that tools are ready at the correct place for the particular operations, that the work is moving according to routing instructions. Dispatching carries out the physical work as suggested by scheduling. Thus, dispatching implies the issuance or work orders. These work orders represent authority to produce. These orders contain the following information: * The name of the product; * The name of the part to be produced, sub-assembly or final assembly; * The order number; * The quantity to be produced; * Descriptions and numbers of the operations required and their sequence, * The departments involved in each operation * The tools required for particular operation; and * Machines involved in each operation and starting dates for the operations.6. ExpeditingExpedition or follow-up is the last stage in the process of production control. This function is designed to keep track of the work effort. The aim is to ensure that what is intended and planned is being implemented. "Expediting consists in reporting production data and investigating variances from predetermined time schedules. The main idea behind expedition is to see that promise is backed up by performance". It includes the following functions:* Check-up to ensure that all materials, tools, component parts, and accessories are available at all work centers in specified quantities for starting and carrying out manufacturing operations. * Check-up on the status of work-in-progress and completed work at various work stations. This includes collecting information relating to the starting and completion time and date of work completed, status of work-in-progress relative to scheduled completion dates, position of movements of materials, component parts, and sub-assemblies within the plant, and inspection results. * Preparation of progress records and keeping the control boards up-to-date. * Reporting to manufacturing management on all significant deviations so that corrective action may be taken. It also includes reporting to production planning department so that future plans may be adjusted. Thus production planning and control by completing the above discussed phases ensures the manufacturing of goods of right quality, quantity and at competitive market rates. One thing must be borne in mind that production planning and control is a never-ending process, and its various functions are inter-dependent.


What problems does carnegie associated with industrialization and the workers?

no


What are the industrial safety problems?

Industrial safety problems are problems that could result in injury to industrial workers or damage to industrial property. They include fire and explosion hazards, sharp edges, falling, hot parts and materials, heavy parts movement, and much more.

Related questions

What has the author Jeffrey William Herrmann written?

Jeffrey William Herrmann has written: 'An investigation of production scheduling problems motivated by semiconductor manufacturing' -- subject(s): Accessible book


What are the problems with processing and manufacturing chemicals?

There are only three problems in making chemicals:safetysafetyand SAFETY


What is the economic problem of manufacturing in the Philippines?

agricultural problems


What 3 categories are environmental problems generally grouped into?

Environmental problems are generally grouped into three categories: pollution, loss of biodiversity, and depletion of natural resources. Pollution refers to the contamination of air, water, or soil by harmful substances. Loss of biodiversity relates to the decline in the variety and abundance of plant and animal species. Depletion of natural resources refers to the unsustainable extraction and consumption of resources such as fossil fuels and minerals.


What are the problems in purchasing strategies in food industry vehicle industry and manufacturing?

!


Do you need any applications in scheduling software?

If you are looking at scheduling software, kappix is a good one. Scheduling software is basically like an online planning book so if you buy it and download it online you should be able to use it without any problems. On the website it should tell you whether you need the applications with that software.


What is online scheduling and offline scheduling?

Online scheduling is the useage of competitive analysis (or online algorithms) on scheduling problems. Online algorithms is characterized by making decision "online", which means a point in the time axe. In this point of time, we can not see the future jobs or tasks, whereas we only know the jobs or tasks before or at this point of time. In contrast, in offline scheduling problems, there is no the conception of "point of time". We are lords of the world. We stay outside the real world and can see the past and future (jobs or tasks). TThis aspect is called "offline". Since we can see the past and the future, we know the total knowledge of the problem before we make decision (not depending the time). Even use the simpliest method, such as enumeration, then we can obtain the optimal solution. Nontheless, by not knowing the future knowledge of problem, we must make decision. Then we use a critierion to meaure the performance of online algorithm, called competitive ratio. This is a conception like approximation ratio, compering the objective value obtained by online algorithm and that of offline (optimal) algorithm. Offline scheduling is concerned of the classical scheduling problems. Not introducing the conception of "online". Offline scheduling problem is scheduling problem.


What problems do natural resources create?

the answer is it can kill u if u hurt urself


Which interaction focus on problems with resources?

The interaction that focuses on problems with resources is typically referred to as a resource constraint. It occurs when there is a scarcity or limited availability of resources necessary to meet demand or complete a task. This can lead to challenges in achieving goals and may require alternative solutions or prioritization of resource allocation.


What are 2 problems with your land resources?

its water and land


What are the problems with exessive population?

Crowding and Lack of Resources


What has the author Salvador Lugo written?

Salvador Lugo has written: 'Trends and problems of the local Puerto Rican-owned manufacturing industries' -- subject(s): Manufacturing industries