1. Obtain the approved blind list from the owner/client.
2. Study the P&ID to ensure the correct line to be isolated.
3. Conduct the join site visit with owner/client.
4. Obtain PTW, start your blinding/deblinding work.
5. Please ensure your QC inspector is present during break flange work. Remember, gasket,flange surface need to be inspected.
Not if you follow the procedure in the owners manual.Not if you follow the procedure in the owners manual.
Pipeline Welding requires loads of experience to produce defect free weld. for the recruitment companies which are doing pipeline construction work, there will be a welder selection procedure to follow up. The welder will be selected based on that test.
Jonny did not follow the procedure his teacher ann gave him by:katara brown
Obstacles to following written procedures include:The procedure is poorly or unclearly writtenThe procedure is overly long and complexThe procedure is not readily available to the person who must follow it.The procedure is not written in a language that can be read by the person who must follow it.The person who much follow the procedure is unable to readThe procedure calls for incorrect or improper actionsThe procedure makes unfounded assumptions about the level of knowledge of the person who will use it.
To get it right .
Follow the established procedure to ensure proper completion of the task.
Please follow the procedure at this link address. This procedure is from an answer found on this site.How_do_you_change_a_heater_core_in_a_1997_Camaro
I have given you this answer. You may now procede with your vocabulary test.
I have several sentences for you.It is procedure to check in at the front desk.Always follow proper procedure.Police procedure requires a chain of evidence.
We want to join ISI.What is the procedure which we should follow. How much qualification do we need. How we can serve our country in this way?
No cheats, you have to follow procedure.
hey