answersLogoWhite

0

make sure the lot[s] is zoned R4. And that enough space exists to

support the number of rental units you want to build. Find financing.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

What are the steps required in order to build and manage an indoor sports arena?

The steps are not the issue, the issue is an indoor sports arena


What are the steps of the Project Life Cycle?

The steps of the Project Life Cycle includes five steps. These five steps are project initiation, project planning, development, implementation and project closure.


Definition of a project sales manager?

what are the steps in project sales? what are the steps in project sales?


How do you properly build footings for a construction project?

To properly build footings for a construction project, you need to follow these steps: Determine the type and size of footing required based on the building's design and soil conditions. Excavate the area where the footing will be placed, ensuring it is level and at the correct depth. Install any necessary reinforcement, such as rebar, according to the project specifications. Pour concrete into the excavated area, making sure it is properly mixed and compacted. Allow the concrete to cure and harden before continuing with the construction process. By following these steps, you can ensure that the footings for your construction project are built properly and will provide a solid foundation for the building.


What are the necessary steps to build a stub wall in a residential construction project?

To build a stub wall in a residential construction project, follow these steps: Measure and mark the location of the wall. Cut and assemble the framing lumber to create the wall frame. Secure the frame to the floor and ceiling using nails or screws. Install insulation between the studs for energy efficiency. Add drywall or other finishing material to cover the frame. Finish the wall with paint or other desired finishes. These steps will help you successfully build a stub wall in your residential construction project.


How can I build stone steps in my backyard?

To build stone steps in your backyard, first plan the layout and design. Then, dig out the area for the steps and create a solid base with gravel and sand. Place the stones in the desired pattern, making sure they are level and secure. Finally, fill in the gaps with more gravel or sand to finish the project.


What are the various steps involved in project selection?

The various steps are:- Creating a Project Charter- Conduct a Business Impact Assessment- Use the Project Evaluation Scorecard to see the project's value to the organization.


What steps to take when leasing apartment ?

In order to get an apartment lease you need to go out and look for apartment. Once you have found one that you like and one that is in your price range you would sign a lease with the apartment complex.


How many main steps are followed in project method?

six steps


What is a project and a non project?

A project is a piece of work that you work on in several steps. I don't know what a non project is though.


What is the explanation for the steps involves in project identification?

explain the poocess of project identification


What are the composite steps involved in completing this project?

The composite steps involved in completing this project include planning, research, execution, evaluation, and presentation.