answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: When a new system has been assembled built up and is ready for testing the first to do is?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How was built the Statue of Liberty?

How was The Statue of Liberty built?The Statue of Liberty was a gift imported to the U.S. by the French. First the pieces were built and assembled then diassembled into 350 pieces and stored in 214 crates then the parts were shipped to bedloe's island New York and then assembled.


How was the statue liberty built?

How was The Statue of Liberty built?The Statue of Liberty was a gift imported to the U.S. by the French. First the pieces were built and assembled then diassembled into 350 pieces and stored in 214 crates then the parts were shipped to bedloe's island New York and then assembled.


When was the first Henry Ford truck made?

The Ford Motor Company built its first factory assembled pickup truck in 1925.


Who built the first apple computer?

Steve Wozniak and Steve Jobs built, programmed, and sold the first Apple computers.


Is Mitsubishi lancer ex car model 2007 built and assembled in japan?

Look at your VIN number, the first digit of this ungodly 17-digit number is known as the 'country code.' If it starts with a J, it was assembled in Japan. If is starts with a 4, it was assembled in the USA.


What was the first country produced Tesla car?

Body is built in England, electric motors are produced in Taiwan, car is assembled in California.


What year was the bomb built for Enola Gay?

The parts for the first atomic bomb were built in 1944 as a result of research that had been going on for over 10 years. It was assembled on the flight to Hiroshima.


What was the name of the first shuttle named after Star Trek?

Enterprise. It never flew in space. It was built for glider testing.


What is system testing in manual testing?

System testing is the type of testing to check the behavior of a complete and fully integrated software product based on the software requirements specification (SRS) document. Its a series of different tests whose sole purpose is to exercise the full computer based system. In SDLC, System Testing is perform as the first level of testing where the system is tested as a whole. In System Testing, we test the both Functional as well as Non Functional parameters of Software Testing. System testing involves testing of following: Testing the fully integrated applications including external peripherals in order to check how components interact with one another and with the system as a whole. This is also called End to End testing scenario. Verify thorough testing of every input in the application to check for desired outputs. Testing of the user's experience with the application. . That is a very basic description of what is involved in system testing. You need to build detailed test cases and test suites that test each aspect of the application as seen from the outside without looking at the actual source code. Every software testing company consider all these things while performing system testing.


In which year the first analog computer was assembled by isi of calcutta?

The first Indian analog computer was assembled in 1950


Where was the first electric trolley system built?

Montgomery, Alabama


The first nation built on a capitalistic system was .?

Netherlands