answersLogoWhite

0


Best Answer

1998

User Avatar

Wiki User

12y ago
This answer is:
User Avatar
More answers
User Avatar

Anonymous

Lvl 1
3y ago

1985

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: When did aerosmith rockin roller coaster open?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the plural noun of an underwater roller coaster?

The plural is underwater roller coasters. The word underwater is an adjective describing roller coaster, adjectives don't take plural forms. Roller coaster is an open compound noun, the plural 's' goes on the end of the noun.


How do you save the design of a custom built roller coaster in roller coaster tycoon 3?

To save a roller coaster design simply select your roller coaster with your cusor and open the detials icon located to the right of the roller coaster cars design, now click the save ride icon and it will be saved. But make sure you name the ride before doing this other wise it may be saved as somthing you dont want. To delete the roller coaster go into the rct3 folder you created when you installed the game open the folder and go on coasters and simply delete the roller coaster you dont want. This is a great game, have fun playing it.


When did the Fujiyama roller coaster open?

The Fujiyama roller coaster opened in 1996. It was rated as one of the top 50 steel roller coasters in 2009. It has over a mile of track and is highly rated.


Will the flying turns roller coaster at Knoebels be open in 09?

no it is supposed to poen in the 2010 season


How do you open new park entrances in Roller Coaster Tycoon 2 and open new gates in Roller Coaster Tycoon 2?

Just click on them and press the green light


How do you un lock levels on roller coaster tycoon?

Beat unlocked parks first and new ones will open


How many customers per day ride a roller coaster?

This depends on the roller coaster. Some roller coaster can get up to 2,000 riders per hour, which means they can handle around 50,000 riders per day! But other ride with 500 riders per hour would get around only 10,000. Plus breakdowns and park hours limiting when the ride is open, about 5,000-25,000 every day.


When is the son of beast roller coaster going to re-open?

Probably never again will we ride this terror they call the Son of Beast. [HURRAY!:)]


What is the first stage that will open in 2012 in fantasyland at Walt Disney World?

The first things to open will be the new DUMBO ride, caseys Jr., and the Great Goofini roller coaster.


Will there Ever be a 200 mph roller coaster?

The newly founded ride company, Emray is currently working to achieve this. They hope to open one by 2021.


Is the Sky Ride roller coaster in Dragon Centre in Hong Kong open?

It has been SBNO (Standing but not operating) since between 2002 and 2005. No information of when or if the ride will be open again is discoverable.


Theme of Knott's Berry Farm?

Montezooma's Revenge 1978 Anton Schwarzkopf A steel roller coaster with an open-circuit that catapults riders through a 7-story vertical loop. Timberline Twister 1983 Bradley & Kaye Small steel coaster designed for young children. Boomerang 1990 Vekoma Steel roller coaster with an open-circuit takes riders upside-down a total of six times. Jaguar! 1995 Zierer GmbH Family-oriented roller coaster. GhostRider 1998 Custom Coasters International Wooden roller coaster with 4,533' of track. Xcelerator 2002 Intamin Accelerator Coaster featuring steeply banked turns and a vertical drop. Silver Bullet 2004 B&M Floorless coaches suspended beneath an overhead track whip around steeply banked turns and six inversions. Sierra Sidewinder 2007 MACK Rides GmbH & Co KG Family-oriented roller coaster featuring vehicles that spin freely on a turn-table chassis. Pony Express 2008 Zamperla Family-oriented roller coaster featuring sweeping turns.