Want this question answered?
Be notified when an answer is posted
Each row of block is 1 course. <><><> Yep- means the basement wall is 13 rows of concrete block tall. With the mortar joints, about 9 feet.
in an underground basement
Nope. The sun is considered a star.
The photosphere is the layer that is considered the sun's surface!
8 not including Pluta since its considered a Dwarf planet 8 not including Pluta since its considered a Dwarf planet 8 not including Pluto since its considered a Dwarf planet 8 not including Pluto since its considered a Dwarf planet
In a basement if indoors, if you do not have a basement try to get into a crawlspace or bathtub! And cover your head to protect it from glass and other flying objects.
In a basement if indoors, if you do not have a basement try to get into a crawlspace or bathtub! And cover your head to protect it from glass and other flying objects.
You disconnect it in the basement or crawlspace and remove it through the wall. Fit new one in the same way
If you have a wood floor that is over a crawlspace or basement, there may not be any insulation. Heat rises. Also, if you have drafty doors or windows, that may have an effect.
Crawlspace - band - was created in 1998.
The duration of Crawlspace - film - is 1.33 hours.
Crawlspace - film - was created on 1986-05-21.
The duration of Crawlspace - animated short - is 480.0 seconds.
Crawlspace - animated short - was created in 2004-04.
Crawlspace - 2013 was released on: USA: 4 January 2013
The Crawlspace - 2006 V is rated/received certificates of: USA:R
Downstairs? First floor with a basement or in the basement? If first floor with access in the basement or crawlspace, no real problem. PVC, just cut the pipe and install a T. Cast iron, you can use a Saddle Clamp made for this. Looks like a PVC T split length wise and held to the cast iron with two U bolts. If adding a bath in the basement, you will have to bust out the floor, add the drain and replace the cement.