It is best to install grass reinforcement during the growing season because it allows the grass roots and grass reinforcement to interlock well and create a stabilise surface that can tolerate cars or any high traffic human activities. You can check out grassreinforcement.com.au for a range of highly effective Park on Grass products.
A variable ratio schedule of reinforcement is best for building persistence. This schedule provides reinforcement after a varying number of desired behaviors, which helps to maintain consistent motivation and effort over time. The unpredictability of reinforcement keeps individuals engaged and persevering in their actions.
The best time to install conduit is before the plumbers and sheet metal trades get into the building. <<>> In underground installations before the trench gets back filled.
Rye grass.
Reinforcement is given on an intermittent reinforcement schedule at varying and unpredictable intervals, such as after a specific number of responses (ratio schedule) or after a specific amount of time has passed (interval schedule). This type of reinforcement schedule can be more effective in maintaining behavior compared to continuous reinforcement.
Ratio reinforcement schedules deliver reinforcement based on the number of responses emitted by the individual, while interval reinforcement schedules deliver reinforcement based on the passage of time and the first response after a specified time interval. Ratio schedules tend to generate higher response rates compared to interval schedules.
partial reinforcement i reinforcing a response part of the time.
after the elephant passes
A fixed interval schedule of reinforcement is a type of operant conditioning schedule where a reinforcement is delivered at a consistent time interval, as long as the desired behavior is exhibited. This schedule typically leads to a low rate of responding after the reinforcement is delivered, followed by an increase in behavior as the time for the next reinforcement approaches.
There are two kinds of reinforcement schedules. The first is continuous reinforcement where desired behavior is reinforced every time. The second schedule is partial reinforcement where a response is reinforced part of the time. Within partial reinforcement, there are four schedules which include fixed-ratio, variable-ratio, and fixed-interval and variable- interval.
The best time to install conduit is before the plumbers and sheet metal trades get into the building. <<>> In underground installations before the trench gets back filled.
This depends on which type of grass you're planting and where in the world you happen to be planting it.
The best time to plant Bemuda grass is when the night time temperatures are above 65, and that is late late May, June time frame.