Thaketa Township was created in 1959.
The population of Thaketa Township is 322,000.
Shwepyitha Township was created in 1986.
Hlaingthaya Township was created in 1985.
Verulam Township was created in 1831.
Bridge in Metal Township was created in 1907.
South Dagon Township was created in 1989.
Bridge in Cumberland Township was created in 1894.
Bridge in Portage Township was created in 1832.
Bridge in Lewis Township was created in 1890.
Brown Township Building was created in 1883.
Bridge in Greenwood Township was created in 1892.
Bridge in Jenner Township was created in 1908.