NOGAT Pipeline System was created in 1992.
Baltic Pipeline System was created in 2001.
Central Europe Pipeline System was created in 1959.
Baltic Pipeline System-II was created in 2011.
The Pipeline was created in 1993.
Transitgas Pipeline was created in 1974.
Super Pipeline was created in 1983.
Gazela Pipeline was created in 2011.
Transalpine Pipeline was created in 1967.
Sumed pipeline was created in 1977.
Keystone Pipeline was created in 2010.
Vector Pipeline was created in 2000.