02.10.1972
15th August 1972 is a correct answer.
26th/01/1972 i think it is a correct answer
I tink in the month of auguest 2012
India won world cup on 2nd April,2011.It was held in Mumbai.
The date shown on the code taken of the corona bottle is April, 06, 2012. With the code Dl12A046 the month is 04, the day is the 6, and the year is the 12.
Which of the following three C code snippets WILL NOT read a date as three integers as follows: int day, month, year;
All cheques are valid for 6 month from date of Issue
First day Second month last year
1924. There will be a date code stamped on the left side of the barrel you can look up the month/year date code on the Remington Society of America, manufactured date page.
1922 so it will have the date code on the barrel for month as well. Check the date code stamped on the barrel. Remington Society of America, Manufactured Date link has the details.
What was the exact date Chanel #5 was introduced
They were made from 1932-1935 so the month/year is date code stamped on the barrel. Check the manufactured date link on the Remington Society of America for details and code look up table.