Liquid tight metal conduit may serve as a grounding means in sizes up to and including what in.
Liquid tight metal conduit may serve as a grounding means in sizes up to and including what in.
Normally the main is on the top but you can install a service panel with the main on the bottom unless local codes prohibit it.
If what you state in this question is accurate this is an illegal installation. A 100 amp service can not have any equipment connected to it less that that of the service size. The 60 amp main panel must be a 100 amp panel to be a legal installation.
The outside breaker box is typically located near the main electrical panel, but outside the building or house.
The meter is typically installed in the main circuit panel of the house. If you want to move it, you can do it as part of a service / panel upgrade. We did this when we moved into our new house - we replaced the 1950s vintage main circuit panel and 100A service with a newer 200A panel and service. It was about a grand, but we didn't actually move the panel from where it was, so it may cost more for what you want.
The line side in a building's main electrical service panel is important because it is where the incoming electrical power from the utility company enters the building. This is where the main disconnect switch is located, which controls the flow of electricity into the building. Properly managing the line side ensures the safe and efficient distribution of electricity throughout the building.
50 amps
The main panel is the primary source of power distribution in a building, while a sub panel is a secondary panel that receives power from the main panel. The main panel is typically larger and has a higher amperage capacity, while a sub panel is smaller and has a lower capacity. The main panel is usually located near the utility meter, while a sub panel can be placed in a different area of the building.
50 amps
The main breaker is typically located in the main electrical panel, which is usually found on the exterior wall of the house near the meter.
Driver side- panel on side of dash pry off and there they are!
It is connected to the cut out fuse which enables isolation of the circuit from the supply when there is a fault.Additional Information:The service cable is usually connected to a meter fixture and from there to the main electric panel which will have a breaker to isolate the panel.