answersLogoWhite

0


Best Answer

Operation Sustainability

User Avatar

Wiki User

12y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Which is not a key planning item associated with the initial step of the planning process?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What magical item is Thor associated with?

His hammer.


Which item is NOT associated with the phylum Rhodophyta?

algin


What is the difference between first and at first?

"First" is used to refer to the initial item in a list or sequence. "At first" is used to indicate the initial stage or period of time in a process or situation.


Time managment doesnt require you to have?

a long-term goal associated with each item on your to-do list.


What is recovery process?

The recovery process is how you replace that item with the same item. Example: The recovery process of trees is to plant another tree in it's place.


What is Pro to type in designs?

Do you mean Prototype? That is a conceptual model or initial plan for an item.


What is uninitialised pointer?

A pointer is an address or the name for the location for an item of data. An uninitialised pointer is one that has not been assigned an initial value or item of data.


What is locks in DBMS?

a lock is variable associated with a data item that describes the status of the item with respect to possible operation that can be applied to it.


What is Meiko's item?

Sake. It's also Haku's item, so some people get confused. She didn't originally have an item, because she was released before the item craze, but was later associated with sake.


How much does this item weigh?

According to the planning guide, the approximate weight is 71 Lbs.


What is swaging?

Swaging is the process in which the size of an item is changed during the forging process.


Which area of technology might be associated with this item safety device?

forces and motion