answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: Why did the Egyptians raise the stones onto the pyramid?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about General History

What simple machine did the ancient egyptians use to help build the pyramids?

The most important "machine" was the inclined plane, the ramp used to raise the stones to the working level. The lever used to manhandle the stones into position and in the quarries to lift the stones onto the sledge on which they were transported. In the absence of the wheel the sledge with its narrow runners minimised the effects of friction.


Where did the egyptians transport the rock to build the pyramids?

Most of the stones used to build pyramids were quarried close by to avoid transportation over long distances. At the Giza pyramid site the quarries can still be seen. The stones once cut of the rock face were loaded onto sledges dragged by gangs of slaves along a specially prepared causeway probably laid with wooden planks.


How did the egyptians raise the stones onto the piramid?

Muscle power and simple mechanics, they used simple levers to lift the stones short distances such as manoeuvring it into place or lifting it on or off a sledge. To get it to the working level they built a ramp (inclined plane) up which the sledge was dragged by a gang of slaves. To ease the passage of the sledge water or oil was poured under the blades.


What did the Egyptians use to carry rocks from the quarry to the pyramid?

♪ slaves! built the pyramids ♪ The limestone blocks were cut out in the quarries close the pyramid site. Once the limestone blocks quarried they were lowered onto sledges. Gangs of slaves dragged the sledge along a causeway laid with planks. Water or oil was poured in front of the blades of the sledge to help them slide more easily.


How did Egyptians move stone up a pyramid?

Most of the stone used was quarried locally. The most likely method was to load the stone block onto a sledge hauled by a gang of slaves using rope made from papyrus reeds. Granite was also used. This was quarried some 600 km down river and brought to the pyramid by boat. A specially built causeway links the river with the construction site. Again sledges were used to drag the stones from the river to the construction site. Hundreds of slaves were required to haul these monster blocks weighing anything up to 70 tonnes.

Related questions

How did the Egyptian raise the stones onto the pyramid?

Skilled stone cutters in Egypt made stones


What simple machine did the ancient egyptians use to help build the pyramids?

The most important "machine" was the inclined plane, the ramp used to raise the stones to the working level. The lever used to manhandle the stones into position and in the quarries to lift the stones onto the sledge on which they were transported. In the absence of the wheel the sledge with its narrow runners minimised the effects of friction.


Where did the egyptians transport the rock to build the pyramids?

Most of the stones used to build pyramids were quarried close by to avoid transportation over long distances. At the Giza pyramid site the quarries can still be seen. The stones once cut of the rock face were loaded onto sledges dragged by gangs of slaves along a specially prepared causeway probably laid with wooden planks.


How did the egyptians raise the stones onto the piramid?

Muscle power and simple mechanics, they used simple levers to lift the stones short distances such as manoeuvring it into place or lifting it on or off a sledge. To get it to the working level they built a ramp (inclined plane) up which the sledge was dragged by a gang of slaves. To ease the passage of the sledge water or oil was poured under the blades.


How do you get on to the pyramid on binweevils?

I know how to get onto the pyramid you need your special move super jump to get across to the pyramid.


How did the egyptians move limestone blocks?

They built barges usually out of papyrus. They loaded the stones onto the barge and sailed them up and down the river. This allowed the Egyptains to move heavy stones such as obelisks over long distances.


What did the Egyptians use to carry rocks from the quarry to the pyramid?

♪ slaves! built the pyramids ♪ The limestone blocks were cut out in the quarries close the pyramid site. Once the limestone blocks quarried they were lowered onto sledges. Gangs of slaves dragged the sledge along a causeway laid with planks. Water or oil was poured in front of the blades of the sledge to help them slide more easily.


How did Egyptians move stone up a pyramid?

Most of the stone used was quarried locally. The most likely method was to load the stone block onto a sledge hauled by a gang of slaves using rope made from papyrus reeds. Granite was also used. This was quarried some 600 km down river and brought to the pyramid by boat. A specially built causeway links the river with the construction site. Again sledges were used to drag the stones from the river to the construction site. Hundreds of slaves were required to haul these monster blocks weighing anything up to 70 tonnes.


How did they transport the materials to and from the pyramids?

The ancient Egyptians used various methods to transport materials to and from the pyramids. One method involved using boats to transport heavy stones and building materials along the Nile River. They also used sledges and wooden sleds to pull and transport materials over land. Additionally, they may have used ramps and levers to move large stones into place.


How do you find the sum of 20 and 40?

-- Drop 20 pennies or little stones onto a small patch of bare ground. -- Drop 40 more pennies or little stones onto the same place. Do it carefully, so that you don't scatter them. -- Pick up all of the pennies or little stones and count them. The number you have is the sum of 20 and 40.


How was the Egyptian pyramid built?

Thousands of workers spent years of hard work to build the pyramids. Farmers did a lot of the work during summer when the Nile River flooded and they could not farm. Surveyors, engineers, carpenters and stonecutters helped to build the pyramids. The first engineer who built pyramids was Imhotep who also served as an official for the pharaoh. The workers searched for stone in places throughout the Nile River valley or in Upper Egypt. After locating the stone artisans used copper tools to cut the stone into huge blocks. The workers used rope to fasten the blocks onto wooden sleds that were pulled along a path made of logs to the Nile River. The stones were then moved onto barges that carried them to the building site. There, the workers unloaded the blocks and dragged or pushed them up ramps to be set in place at each new level of the pyramid. The Egyptians faced many challenges as they built the pyramids, but these challenges, however, led to important discoveries. Each pyramid rested on a square-shaped foundation, with an entrance facing to the north. To find which direction north was the Egyptians studied the skies and developed an understanding of astronomy and with this knowledge, they invented a 365-day calendar with 12 months divided into 3 seasons. This calendar then became the basis for our modern calendar. The Egyptians also made advancements on math. Egypt's pyramid builders had to calculate how much stone was needed to build a pyramid and had to measure angles in order to construct a pyramid's walls. To be able to do this, they invented a system of written numbers based on 10 and and also created fractions, using them with whole numbers to add, subtract, and divide.


What simple machine will make it easier to raise a heavy box onto a platform?

A pulley.