they would do it so that it would sell better and so that it would look at least good enough to sell.
So that they can make any changes to the design because the engineer probably wont get it right the first couple of times.
So that they can make any changes to the design because the engineer probably wont get it right the first couple of times.
Iterate to improve the solution
a stationary prototype
Every machine must be designed by an engineer. Or in many cases a team of engineers. Once the design is complete, a prototype must be assembled by a person or by many people. This prototype is then tested. After testing, reports are sent back to the engineers who initially designed the machine to have the design perfected. At this point another prototype must be assembled and tested. Once the machine is proven to be fully functional, the machines are put on the market.
Before to implement a whole idea in the form of product to the market. A prototype is manufactured of the same dimensions as original product and having the same material properties. If the result is satisfactorily and matching the design parameters. Then it's the right time to implement the idea and introduce to market in the form of product to the customer. If it fails, you can change the design parameter and improve it. Actually in this way you save your time and money both.
Field testing
Car engineers, design engineers, tire safety engineers; anyone that would be involved in the design, assembly, safety, or testing of cars.
Results of product testing
yes
At Milestone C, a production representative system, also known as a production representative prototype, is required for testing and evaluation. This prototype should closely resemble the final production system and is used to assess the system's performance, readiness for production, and ability to meet user requirements. Additionally, operational testing and evaluation are conducted to verify the system's effectiveness in a realistic operational environment.
The fire that killed Grissom, White and Chaffee during testing and training excercises.
Milestones are stages in a project at which something is completed.The first milestone is typically "the Design is complete".Further milestones would include:The prototype is completeThe User Interface is ready for testingThe product is ready for Beta testing