answersLogoWhite

0

Why do you not over load sockets?

User Avatar

Anonymous

14y ago
Updated: 8/18/2019

Because of the risk of fire

User Avatar

Wiki User

14y ago

What else can I help you with?

Related Questions

Can you add sockets to a cooker circuit?

No, you should not add sockets to a cooker circuit. Cooker circuits are designed for a specific load and adding sockets may overload the circuit and pose a safety hazard. It is recommended to install a new dedicated circuit for additional socket outlets.


What are RAW sockets?

It gives you more control over the port data.


When was Over Load created?

Over Load was created on 2009-05-13.


Will Larzuk add sockets to items that already have sockets?

No, Larzuk will not add sockets to items that already have sockets. He can only add sockets to items that do not have any sockets.


What do sockets do in Java programming?

In Java programming sockets allow a communication link between programs. They communicate with the server to enable this process and allow communication over the network.


What is driver over load?

too much load


What is noncontinuous load?

A continuous load is a constant load. A noncontinuous load is one that varies over time.


Why did the Titanic over load?

The Titanic didn't over load, it hit a iceburg which flooded the boat.


What are the different types of pendant light sockets available for purchase?

The different types of pendant light sockets available for purchase include standard sockets, candelabra sockets, medium sockets, and mogul sockets.


What are the different types of light sockets available in the market?

The different types of light sockets available in the market include screw-in sockets, bayonet sockets, pin sockets, and twist-lock sockets. These sockets vary in design and compatibility with different types of light bulbs.


What are the different types of hanging light sockets available for purchase?

The different types of hanging light sockets available for purchase include standard sockets, candelabra sockets, and medium sockets.


Why there should be a gap between the load applied to the structure and the factored load on the design?

to minimize over load