atch production is the manufacture of different version of the same basic product in batches (eg. different colour, types of paint, different varieties of jams etc)

There is some repetition of production which is for stock (rather than to order). Production is not continuous. Change-over between batches means that resources are idle at times. Consequently, production managers have to plan production schedules to minimize changeovers. The machinery employed will be specialised for production of the firm's products, but yet flexible enough for different batches.

Flow Production requires specialist machinery. Because of the high capital investment requirement, it is essential to achieve high level of utilisation. This requires a high level of sales of a fairly standardized product made for stock.

Flow production links up with a strategy of undifferentiated marketing whereas batch production suggests that the product is tailored to suit the needs of particular customers or segments.

The manpower required is specialist, but low in skills and performing repetitive task as compared to batch production where the levels of skills required are comparatively high.

The great advantage of line production is that with long production runs unit costs will be very low as compared to batch production.

User Avatar

Wiki User

10y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

10y ago

a change may require a large initial investment

production may be interrupted due to the change

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Why might a manufacturer change from batch to flow production?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

The production of light when two substances are mixed might indicate that?

This is a chemical change.


What factors are considered while changing from batch to flow production?

-A change in labour requirement might mean redundancies and compensation payments for some of the workers. -the skill level required to operate more mechanised systems is often much lower, which will demotivate multi-skilled workers. -more investment is required in preventive maintenance as the production system becomes more mechanised.


Why might a car manufacturer change the shape of side mirrors on a particular model?

because of the wind and so the windows don't get damaged


What does 09MA17 on an expiry date mean?

It possibly means March 17, 2009. If it were May, it might have been written "MY". But for an expiration date, that's not very clear. It could be a production date rather than an expiration. It might be best to contact the manufacturer.


What does pre 96 mean?

It means that something was made, or existed, before 1996. 1996 might be the year a law was enacted, or a manufacturer made a major change to their product.


Why does your batch file close every time?

If a batch file closes every time, it may have a problem. It might close after a certain period of time, or if it has remains inactive for a certain period of time.


How the objectives of a business may change as it grows?

A business may achieve an objective and will need to move onto another one (e.g. survival in the first year may lead to an objective of increasing profit in the second year). The competitive environment might change, with the launch of new products from competitors. Technology might change product designs, so sales and production targets might need to change.


How objective of a business may change as it grows?

A business may achieve an objective and will need to move onto another one (e.g. survival in the first year may lead to an objective of increasing profit in the second year). The competitive environment might change, with the launch of new products from competitors. Technology might change product designs, so sales and production targets might need to change.


What inverter did a 1990 van buckit truck come with?

The inverter was an aftermarket accessory, as was the entire bucket body. The manufacturer had a range of options they could choose from as far as accessories such as an inverter went. There should be an ID number on the bucket lift somewhere. If the manufacturer is still in business, they might be able to pull up the production record and tell you this.


When to change transmission fluid for Toyota Echo 2003?

For automatics, there is no manufacturer defined change interval. If you drive in dirty conditions a lot, you might want to change it every 80k miles. Under normal conditions you may not want to ever change it. There are echo's on the road with 400,000 miles that have never had a transmission fluid change.


What is a pilot lot in manufacturing process and How to arrive the pilot lot size before mass production?

Pilot lot is more like prototype products manufactured and inspected and validated. If the output is a bunch of small products like caps, tooth brushes. Pilot lot is the first batch of caps or brushes made and validated. It will be inspected for all characteristics that the customer need and will be shipped with first consignment to the customer. Pilot lot is also known as first article/ first batch. Customer might also insist to make a pilot lot inspection to the supplier when there is a change in drawing/specification in the order.


What are the three production cost that might go into the production of cookies?