answersLogoWhite

0


Best Answer

to avoid electrical field strength which may give rise to partial discharge and ageing of power cables

User Avatar

Wiki User

13y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Why semicon layer needed in high voltage power cable manufacturing process?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is marshaling?

person of authority


What are the characteristics of a production planning?

Production planning is the administrating process within a manufacturing business. The characteristics of a production planning involve having the staff, raw materials, and other items needed to run the manufacturing business.


Why is rectification needed?

To convert AC voltage to DC voltage.


Wire size for an electric range?

Wire size is based of the amperage of the device. To answer this question the amperage is needed or the wattage and voltage of the device.


Why you use sub station?

An electricity substation is needed to change the high voltage needed for transmission of power over a distance down to low voltage needed to supply houses etc.


What voltage is needed for electric ovens?

240V


What is the spark plug voltage?

Spark plug voltage is high tension voltage, needed to jump a spark between the plus and minus poles. Needed tension is about a minimum of 10.000 Volt between the poles.


Which gas is needed for the manufacturing of soda?

carbon dioxide (CO2)


WHAT IS THE LOWEST VOLTAGE NEED TO LIGHT A LIGHT BULB?

A light bulb is manufactured to operate on a specific voltage. The voltage can be a low as needed and the manufacturer will compute the size of the filament that is needed for a specific wattage. If you are referring to a threshold voltage then that is another question that needs to be asked.


What size wire is needed for a 180' run?

To answer this question the voltage and load amperage is needed.


How more voltage is needed to power a chip?

5vts.


Applied overhead vs actual overhead?

APPLIED Overhead is computed using the predetermined overhead rate and is the amount of costs applied (or estimated) to be allocated (needed) for specific jobs. ACTUAL Overhead is found after the manufacturing process is complete which gives the actual amount of used/consumed resources (or total costs) that it needed to complete the job. The two amounts can then be compared afterward which is known as Under- or Overapplied Manufacturing Overhead. When Manufacturing Overhead has a DEBIT balance, overhead is said to be UNDERAPPLIED, meaning that the overhead applied to work in process or to the certain job is LESS than the overhead incurred. On the contrary, when manufacturing overhead has a CREDIT balance, overhead is OVERAPPLIED, meaning that the overhead assigned to work in process or to the certain job is GREATER than the overhead incurred.