to avoid electrical field strength which may give rise to partial discharge and ageing of power cables
To answer this question the voltage is needed.
To answer this question the voltage of the compressor is needed.
200 amps is equal to zero kva. To answer this question a voltage is needed.
go to cliphunter.com and it show u all the answer
The HP of a motor is determined by the manufacturer of the motor. The after market user or engineer then determines what size of HP is needed to operate their type of designed equipment. When the customer buys the equipment needed for their type of manufacturing an electrician is hired to connect the equipment to the electrical system. The electrician then determine the overload protection, wire size and voltage drop on long conductor runs.
person of authority
Production planning is the administrating process within a manufacturing business. The characteristics of a production planning involve having the staff, raw materials, and other items needed to run the manufacturing business.
To convert AC voltage to DC voltage.
Wire size is based of the amperage of the device. To answer this question the amperage is needed or the wattage and voltage of the device.
An electricity substation is needed to change the high voltage needed for transmission of power over a distance down to low voltage needed to supply houses etc.
240V
Spark plug voltage is high tension voltage, needed to jump a spark between the plus and minus poles. Needed tension is about a minimum of 10.000 Volt between the poles.
carbon dioxide (CO2)
A light bulb is manufactured to operate on a specific voltage. The voltage can be a low as needed and the manufacturer will compute the size of the filament that is needed for a specific wattage. If you are referring to a threshold voltage then that is another question that needs to be asked.
To answer this question the voltage and load amperage is needed.
5vts.
APPLIED Overhead is computed using the predetermined overhead rate and is the amount of costs applied (or estimated) to be allocated (needed) for specific jobs. ACTUAL Overhead is found after the manufacturing process is complete which gives the actual amount of used/consumed resources (or total costs) that it needed to complete the job. The two amounts can then be compared afterward which is known as Under- or Overapplied Manufacturing Overhead. When Manufacturing Overhead has a DEBIT balance, overhead is said to be UNDERAPPLIED, meaning that the overhead applied to work in process or to the certain job is LESS than the overhead incurred. On the contrary, when manufacturing overhead has a CREDIT balance, overhead is OVERAPPLIED, meaning that the overhead assigned to work in process or to the certain job is GREATER than the overhead incurred.