1970
The M25 took approximately 13 years to build. 1973 - 1986. It was not built contiguously but piecemeal the sections slowly being joined together.
It is inside the M25.
There are 31 Junctions on the M25
The M25 is Approximately 118 Miles long.
The M25 is 31 years old
Terminal 5 is actually on the M25. All of the other terminals are on the M4 which is just off the M25.
It is known as the M25 or the London Orbital and is 117 miles long
85 miles taking this route:Follow signs out of the airport to M25; once you get to M25, follow signs to M25 HEATHROW (to M3).Once you are on M25, take M25, around London, to M3 to SOUTHAMPTON at J12.Take M3 to Southampton.
The M25 is the motorway that goes around London in England.
M25 sand in1cum
25 miles taking this route:Follow A3 towards LONDON from Guildford to M25. Once you are at M25, follow signs to M25 (W) to HEATHROW.Take M25 around London on the LONDON ORBITAL to HEATHROW. FOLLOW SIGNS to your TERMINAL.