Pls use the GSD package or ASD package
Define direct and indirect labour?"
A seam line allowance is the extra fabric added to the edges of a garment or textile piece to accommodate sewing seams. This allowance ensures that there is enough material to create a secure and durable seam, allowing for adjustments during construction. Typically measured in inches or centimeters, the seam line allowance can vary depending on the type of garment and the sewing technique used. It is an essential consideration in garment design and pattern making.
It's weight of the garment x fabric cost / kg. hi riend iam nagu in India . first total fabric cost in yarn rateand knitting. duying , compating in outer and pcs weight /10000 and totla acc
Apparel costing involves calculating the total cost of producing a garment, including materials, labor, and overhead. First, assess the cost of fabrics and trims, then estimate labor costs based on the time required for production. Additionally, factor in overhead expenses, such as utilities and rent, as well as any shipping and import duties. Finally, sum these costs to establish a total cost per unit, which can inform pricing strategies and profit margins.
To print on trainers, start by selecting the appropriate printing method, such as screen printing, heat transfer, or direct-to-garment (DTG) printing, depending on the material and design. Prepare the surface by cleaning it to ensure proper adhesion of the ink or transfer. If using heat transfer, print your design onto transfer paper, place it on the trainer, and apply heat and pressure using a heat press or iron. For screen printing, create a stencil for your design, apply ink through the screen onto the trainers, and allow it to cure for durability.
method of calculating either SAM and SMV will remain same as follow for the SAM, record 5 cycle of every operation of garment give rating add allowances. for SMV analyse codes (MMT2(GSD,Pro-Man etc.) and get SMV Once having Data base or experience then can put estimated SAM/SMV
SMV is the main factor to be measured in any organization to ensure smooth and smart planning flow through the industry at any level. This should plan through proper Industrial Engineering patterns. SMV is named as Standard Minute Value. SMV is the time required to produce one unit or time required to complete a particular operation. But we must ensure that the SMV factor is based on 100%. So the practical SMV factor is based on the correspondence efficiency. The correspondence efficiency is based on the break even point of the business. This is the very important factor to be measured in any business environment to increase productivity. Just not the basic calculation of the SMV. So when calculating the SMV factor the most important factor is to calculate through the philosophy of MTM1 predetermined analyzing system based on Lean Manufacturing.
Find 5% then half it
at 4shared.com
Smv is a pre calculated time while sam is calculated during any operation evaluation. Tanveer Alvi
To calculate the Standard Minute Value (SMV) for cutting operations, you first need to determine the time required for each task involved in the cutting process, including setup, cutting, and finishing. This time is then adjusted for allowances, such as rest and personal time, typically adding 10-15% of the total time. The formula for SMV is: SMV = (Total Task Time + Allowances) / Production Rate. Finally, the SMV provides a standardized measure of the efficiency and productivity of the cutting operation.
smv
To convert an MP4 file to SMV format, you can use video conversion software or online converters that support both formats. Programs like FFmpeg, Any Video Converter, or online platforms like CloudConvert can facilitate this conversion. Simply upload your MP4 file, select SMV as the output format, and initiate the conversion process. After conversion, download the SMV file to your device.
Yes
SMV would stand for the "Science Museum of Virginia". It was established in 1970 and is located at 2500 West Broad Street, Richmond, Virginia 23220.
Assuming SMV is an acronym for Sake Meter Value (a translation of "nihonshu-do"), then you can calculate a SMV value from a specific gravity (SG) value using this formula:SMV = ((1/SG)−1) × 1443For example, a finished genshu sake with a SG of 0.996 (what my homemade sake typically finishes fermenting at) would have a nihonshu-do of +5.8.
.smv format