The cost of hardware can be considered both fixed and variable, depending on the context. Fixed costs refer to expenses that remain constant regardless of production levels, such as the purchase of servers or computers that do not change with usage. Variable costs, on the other hand, can include expenses like maintenance, upgrades, or additional equipment that fluctuate based on demand or usage. Therefore, while initial hardware costs are typically fixed, ongoing expenses can be variable.
The relataionship of cost between the level of production is determine the fixed or variable cost if cost change with production level then it is variable cost otherwise fixed cost.
Variable cost = Total Cost/ fixed cost
it is obviously variable
No, Janitorial Cost is not a variable cost, it is a Fixed Cost.
If it varies with the level of production then it is variable cost otherwise it is fixed cost.
Fixed cost and variable cost is equal to total cost as per following formula: Total Cost = Fixed Cost + Variable Cost
its a fixed cost
The relataionship of cost between the level of production is determine the fixed or variable cost if cost change with production level then it is variable cost otherwise fixed cost.
fixed and variable
variable
Type your answer here... fixed cost + variable cost = total cost
Variable cost = Total Cost/ fixed cost
it is obviously variable
No, Janitorial Cost is not a variable cost, it is a Fixed Cost.
If it varies with the level of production then it is variable cost otherwise it is fixed cost.
Variable
If salary is on per lecture basis then it is variable cost otherwise it is fixed cost.