answersLogoWhite

0

What else can I help you with?

Related Questions

Total cost is the sum of the?

fixed and variable costs


Fixed cost variable cost equals?

Fixed cost and variable cost is equal to total cost as per following formula: Total Cost = Fixed Cost + Variable Cost


Is clerical salaries a fixed cost or variable cost?

its a fixed cost


The total cost is the sum of what?

When you see TC = Total Costs on a break even chart it stands for Variable, Semi-variable and fixed costs....thus the total cost.


Suppose that you have been planning on processing 50 extra documnets this weekend for a total cost of 250. Given that the variable cost of processing one document is 1 what is hte total fixed cost ass?

To find the total fixed cost, we can use the formula for total cost, which is the sum of fixed costs and variable costs. The variable cost for processing 50 documents at $1 each is 50. Therefore, the total cost of $250 can be expressed as: Total Cost = Fixed Cost + Variable Cost, or $250 = Fixed Cost + $50. Solving for Fixed Cost gives us $250 - $50 = $200. Thus, the total fixed cost is $200.


What determines the difference between a variable and a fixed cost?

The relataionship of cost between the level of production is determine the fixed or variable cost if cost change with production level then it is variable cost otherwise fixed cost.


Production cost is which kind of cost variable or fixed cost?

variable


Is maintenance on production equipment a fixed variable or mixed cost?

fixed and variable


What is the the variable costs plus the fixed costs?

Type your answer here... fixed cost + variable cost = total cost


How do you calculate variable cost?

Variable cost = Total Cost/ fixed cost


Utilities is variable cost or fixed cost?

it is obviously variable


Is janitorial cost a variable cost?

No, Janitorial Cost is not a variable cost, it is a Fixed Cost.