Forever
Construction time for the aqueducts depended upon several factors, so there was no set time for them to be completed. The engineers had to take into consideration distance, landscape, and weather along with the number of men needed to complete the project and, especially, how many bridges needed to be built to carry the water over valleys of to maintain the sloping gradient needed to keep the water moving. The construction of bridgework was the most-time time consuming part.
it took 3 years to build the shard
It took 5 years to build the Ziggurat
As long asthe builders needed!
It will take about 350 years.
1 day
The construction of the Roman Colosseum took approximately 8 years, from 70 to 80 AD.
it depends of the size and the level of complication. large and complex ones can take months.
The Roman Empire took around 500 years to build, starting from the founding of Rome in 753 BC to the establishment of the empire in 27 BC.
it started in 70ad and ended in 82 ad so that is12 YEARS
it started in 70ad and ended in 82 ad so that is12 YEARS
how long does it take to build a asimo
Construction time for the aqueducts depended upon several factors, so there was no set time for them to be completed. The engineers had to take into consideration distance, landscape, and weather along with the number of men needed to complete the project and, especially, how many bridges needed to be built to carry the water over valleys of to maintain the sloping gradient needed to keep the water moving. The construction of bridgework was the most-time time consuming part.
how long did it take to build the half moon
how long did it take to build the scottish parliment?
how long did it take to build cabot tower
It depended on how big the mosaic was and how small the pieces that were used were. Large and sophisticated mosaics built take years to make.