The paint was not fully cured when you used the shower. Now it will not dry until you stop using the shower for an extended time. Your option is to prime with a water based primer, allow to dry fully, coat with a eggshell or better coat, allow to dry fully, then recoat. Then allow to dry fully prior to using the shower.
No, the prime coat can go on anytime.
You should wait about 24 hours between coats of polyurethane when refinishing furniture to allow each coat to fully dry and cure before applying the next one.
Mixing clearcoat with paint, will ruin the paint.For enamel paints, make sure you use an enamel clearcoat. You should allow the paint to fully cure (at least a week) before attempting to apply the clearcoat. Never use a lacquer based clearcoat on an enamel based paint. It will ruin it.For lacquer based paint, you should only use a lacquer based clearcoat. The paint should be dry, but does not have to be fully cured, since the lacquer will wet the coat of paint below it anyway.
The major importance of prime coat on base course should be to produce an appropriate surface for a stronger bond between the asphalt binder course and the base course. Apart from this, the prime coat also discourages the intrusion of surface moisture into the underlying layers.
The primer on a wall should look smooth, even, and fully dry before applying the final coat of paint.
There is a substantial amount of misinformation concerning the function and proper use of prime. Prime is not glue-causing the base to adhere to the pavement is not its purpose. Prime's purpose is to protect the base from rain and light traffic, when the paving will be delayed.A prime coat is an application of an asphalt cutback or emulsified asphalt to a prepared base. The base can be either a sub grade or a base rock. Prime functions as a protector from rain for both types of bases. A primecoat should not be confused with a tack coat. Tack is an a adhesive for gluing two asphalt layers together.
It is recommended to let polyurethane dry for about 24 hours before applying a second coat. This allows the first coat to fully cure and ensures a smooth and durable finish.
Prime Coat MC1 has a density of approximately 1.06 tons per cubic meter. Thus, 1 ton of Prime Coat MC1 is approximately equal to 0.943 liters.
Allow tung oil to dry for at least 24 hours before applying a second coat.
You should generally wait a full 24 hours before adding a second coat of clear to a vehicle. This allows it to fully dry and cure for the best results.
.1 to .25