Yes, pressure treated wood is made to withstand weather without being coated, so there will be no problem waiting to apply a stain. Once you are ready, be sure to clean the wood, then allow the wood to dry before applying any stain or coating.

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

How long do you have to wait before staining pressure treated wood?

You should wait at least 6 months before staining pressure treated wood to allow it to fully dry and cure.


How long do you wait before staining pressure treated wood?

You should wait at least 6 months before staining pressure treated wood to allow it to fully dry and cure.


How long should you wait before staining pressure treated wood?

You should wait at least 6 months before staining pressure treated wood to allow it to fully dry and cure.


How long should I wait before staining pressure treated wood?

You should wait at least 6 months before staining pressure treated wood to allow it to dry and cure properly.


How long should pressure treated wood dry before staining?

Pressure treated wood should typically dry for at least 6 months before staining to ensure proper adhesion and penetration of the stain.


How long do you need to wait before you can stain pressure treated wood?

You should wait at least 6 months before staining pressure treated wood to allow it to fully dry and cure.


When can you stain pressure treated wood?

Pressure treated wood should be allowed to dry for at least 6 months before staining to ensure proper adhesion and penetration of the stain.


When can pressure treated wood be stained?

Pressure treated wood can be stained once it has had time to dry out, which typically takes about 6 months to a year. It is important to allow the wood to fully dry before staining to ensure the best results.


How long should I wait before staining treated lumber?

You should typically wait at least 6 months before staining treated lumber to allow it to fully dry and settle.


How long should treated wood dry before staining?

Treated wood should dry for at least 6 months before staining to ensure proper adhesion and longevity of the stain.


How long should I wait before staining treated wood?

You should typically wait about 6 to 12 months before staining treated wood to allow it to fully dry and settle.


When should I stain a new pressure-treated deck?

You should wait at least 6 months before staining a new pressure-treated deck to allow the wood to dry and cure properly. This will ensure better adhesion and longevity of the stain.