Six years. 2004-2010

User Avatar

Wiki User

14y ago

What else can I help you with?

Related Questions

How long did it take to build the Burj Khalifa?

The Burj Khalifa took about six years to build, from 2004 to 2010.


How long does it take alain to climb the Burj Khalifa in Dubai?

the french spider man started at 6:00 PM to 12:00 Am beging of the moring it took 6 hours to climb the Burj Khalifa


How long does it take to go from the bottom to the top of Burj Khalifa?

8 to 10 minutes on the worlds fastest elevator


Which historically important structure did Nadir Shah take the Peacock Throne?

Burj Khalifa


How many windows Taj Mahal?

There are an estimated 24,348 windows in the Burj Khalifa, Dubai. The glass and steel of the Burj Khalifa would take an estimated eight weeks to clean.


How long did it take Burj Khalifa to be made?

Burj Khalifa took 5 years to be built. The construction began on 21 September 2004, and the exterior of the structure completed on 1 October 2009. The building officially opened on 4 January 2010.


How long did it take to build the Buri Khalifa?

6 years 2004-2010


How long does it take to design a shoe and what steps are their?

as long as you need and decision making


How many years did it take for burj khalifah to be built?

7 years


How long did it take to design the shox?

not very long cuz your way too fat


How long does it take to design class rings?

Depending on the jeweller and the type of design and the intricacy of the design it probably could take up to a month to design a nice class ring. You would have to find a specialist in this field.


How long did it take to design and build spaceship One?

Three years