An interim valuation is a valuation of an asset or property that is conducted outside of the regular valuation schedule. This may be necessary in situations such as a change in ownership, refinancing, or legal proceedings. It provides a current estimate of the value of the asset at a specific point in time.
To prepare an interim valuation on construction, gather progress reports, site visits, and updated cost information. Calculate the value of work completed based on quantities measured on site against the schedule of rates or agreed pricing. Take into account variations, additions, omissions, and any relevant contractual terms to determine the interim valuation amount.
It is the bill that includes cost spent on works which are completed & in progress in a construction. This is prepared by the contractor's Quantity Surveyor & checked by consultancy QS. The purpose of this is to obtain money required for carrying out the works.
The root word of "interim" is the Latin word "interim," which means "meanwhile" or "in the meantime."
what is that...
No such thing as an interim constitution.
procedure of valuation of good will procedure of valuation of good will procedure of valuation of good will procedure of valuation of good will procedure of valuation of good will procedure of valuation of good will procedure of valuation of good will procedure of valuation of good will procedure of valuation of good will
interim distribution
Interim - film - was created in 1953.
An interim means an interval. There was a brief interim in the meeting while everyone got organized.
Adly Mansour is the Interim President of Egypt.
The duration of Interim - film - is 1560.0 seconds.
In the interim of the teacher's absence, we had a substitute teacher.