answersLogoWhite

0

What else can I help you with?

Related Questions

How long before driving on a resurfaced asphalt driveway?

6 hours, unless it's super hot out, than I would double it. You shouldn't turn your wheels on it when the car is not moving though for 2-3 days.


What is the best method for repairing cracks in an asphalt driveway using asphalt driveway crack sealer?

The best method for repairing cracks in an asphalt driveway using asphalt driveway crack sealer is to clean the cracks thoroughly, apply the sealer according to the manufacturer's instructions, and allow it to dry completely before using the driveway. This will help prevent further damage and prolong the life of the driveway.


When do I sealcoat a new resurfaced driveway?

It takes approxamately 90 days for new asphalt to fully cure... It is recommended to seal your new asphalt any time after the 90 day mark, but within a years time. After that, you should be good for 3-4 years before you need to re-seal.


How can I effectively repair asphalt driveways?

To effectively repair asphalt driveways, follow these steps: Clean the driveway surface thoroughly. Fill any cracks or potholes with asphalt patching material. Compact the patching material with a tamper. Seal the entire driveway with a quality asphalt sealer. Allow the sealer to dry completely before using the driveway.


How long before driving on new asphalt driveway?

I just had this done - I was told to wait on average about 72 hours. But since it was real hot the week we had it done, we waited a week before we drove on just to be sure it was settled


What are the key steps involved in asphalt driveway installation?

The key steps involved in asphalt driveway installation include preparing the site by clearing and leveling the area, compacting the soil, laying a base layer of gravel, applying a layer of hot asphalt mix, compacting and smoothing the asphalt, and allowing it to cure before use.


How long before driving on new concrete driveway?

ideally 28 days


Why does gravel need to settle before laying asphalt when redoing driveway?

Gravel needs to settle before laying asphalt to ensure a stable and compact base, which prevents future shifting and settling that can lead to cracks in the asphalt. If the gravel is not properly compacted and settled, it may compress unevenly over time, compromising the integrity of the asphalt surface. Allowing the gravel to settle also helps to minimize moisture retention, reducing the risk of water damage to the asphalt. Proper preparation ultimately leads to a longer-lasting and more durable driveway.


How can you pave your driveway with asphalt grindings when you already have an asphalt driveway with pot holes and sink holes?

to use asphalt millings to repair drive, the best thing to do is to aquire what is called tack, froma paving company. put some of this in with the millings. once the millings have been put in pot hole and rolled , it will set up after a few days of shunshine. should not move again ps: tack is the sticky black oil that is sprayed on a road before putting the asphalt down,to make it stick and bind the 2 sufaces together


What is scarification in road construction?

It is cold planing - or milling - of the asphalt surface. This is done for a number of reasons including the following: -Removing ruts or bumps or irregularities in a roadway before resurfacing. -Lowering a road surface that is to be resurfaced or treated so that it fits the profile of adjacent roads. -Removing existing asphalt that is found to be unacceptable.


You were driving down a main road driver came out of his driveway and hit your car who is responsible?

The driver travelling in reverse is almost always responsible. In this case, he would have had a duty to ensure the road was clear before backing out of the driveway.


How can I effectively patch a driveway?

To effectively patch a driveway, follow these steps: Clean the area thoroughly by removing any debris or loose material. Fill in any cracks or holes with a suitable patching material, such as asphalt or concrete mix. Compact the patching material using a tamper or roller to ensure a smooth and level surface. Allow the patch to cure according to the manufacturer's instructions before using the driveway.