What is the average sq ft for a driveway?

about 300 the average drive way is 12 feet wide by 25 to 30 feet long


What is the average width of a driveway?

The average width of a single car driveway is between 10 and 12 feet. As for a double car driveway, it goes up to 20 feet.


How long does it take to pour concrete for a typical driveway project?

The time it takes to pour concrete for a typical driveway project can vary depending on the size and complexity of the project. On average, it may take 1-3 days to pour and finish the concrete for a standard driveway.


Kevin's driveway is 11 yards long about how many meters is this?

Kevin's driveway is approximately 10 meters long. 1 yard is equivalent to 0.9144 meters.


Brandon can shovel the driveway in 8 min while his brother can shovel the driveway in 12 min How long will it take them to shovel the driveway together?

About 5 minutes for the two of them together. One brother can do half in 4 minutes, the other in 6 minutes. The average of the two numbers is 5 minutes.


What is the average square footage of a driveway?

7 dicks


How long does it take for a heated driveway to heat or warm up?

The time it takes for a heated driveway to warm up can vary depending on the size of the driveway, the temperature outside, and the type of heating system used. On average, it can take anywhere from 15 minutes to a few hours for a heated driveway to reach its desired temperature.


What is the length of a driveway in metric length?

It depends on how far the house is from the pavement as to how long is a driveway!


How long is doctor Cullens' driveway?

It says in Eclipse when Charlie is taking Bella to the graduation party, that the Cullen's driveway is 3 miles long.


Is it legal in Long Beach California to block your own driveway?

Yes it is legal to block your own driveway.


How think should your gravel driveway be?

6 inches is average...


How long does it typically take to seal a driveway?

Sealing a driveway typically takes about 24 to 48 hours to complete, depending on the size of the driveway and the weather conditions.