1970
The M25 took approximately 13 years to build. 1973 - 1986. It was not built contiguously but piecemeal the sections slowly being joined together.
There are 31 Junctions on the M25
It is inside the M25.
The M25 is 31 years old
The M25 is Approximately 118 Miles long.
Terminal 5 is actually on the M25. All of the other terminals are on the M4 which is just off the M25.
The construction of the M25 motorway began in 1975 and was completed in 1986. It is a major orbital road encircling Greater London, providing a vital link for traffic around the city. The motorway has undergone several upgrades and expansions since its completion.
It is known as the M25 or the London Orbital and is 117 miles long
The M25 is the motorway that goes around London in England.
M25 sand in1cum
25 miles taking this route:Follow A3 towards LONDON from Guildford to M25. Once you are at M25, follow signs to M25 (W) to HEATHROW.Take M25 around London on the LONDON ORBITAL to HEATHROW. FOLLOW SIGNS to your TERMINAL.