answersLogoWhite

0

length*breadth*depth of the structure=...........m3 of concrete is needed. .

User Avatar

Wiki User

13y ago

What else can I help you with?

Continue Learning about Basic Math

How much concrete is needed for 8 square meters of slab?

Well, isn't that a lovely question! To calculate the amount of concrete needed for a slab, you'll need to consider the thickness of the slab. On average, for a 10cm thick slab, you would need about 0.8 cubic meters of concrete for 8 square meters. Just remember to always double-check your calculations and enjoy the process of creating something beautiful!


How much concrete needed for 12x30 slab?

To calculate the amount of concrete needed for a 12x30 slab, you first determine the area by multiplying the length (30 feet) by the width (12 feet), which equals 360 square feet. If the slab is to be 4 inches thick, convert the thickness to feet (4 inches = 1/3 feet) and then calculate the volume: 360 square feet x 1/3 feet = 120 cubic feet. Since there are 27 cubic feet in a cubic yard, divide 120 by 27 to find that approximately 4.44 cubic yards of concrete is needed.


How many bags of cement would be needed for a cubic yard of concrete?

Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.


What is the equation to figure out how much concrete is needed?

its about 12x5x67 respectively


How do I calculate the amount of cement needed?

First, things are not made of cement- they are made of concrete- which consists of cement, sand, gravel and water. Mix them using 1 part cement, 1.5 parts sand, 3 parts gravel. To calculate how much CONCRETE you need, multiply depth X width X length in inches, then divide by 1728. This will tell you the number of cubic FEET of concrete. To get the number of cubic YARDS, divide the cubic feet by 27. If you are using packaged concrete mix (Sakrete is one) then an 80 lb bag makes 0.6 cubic feet of concrete. NOTE: If you are working with concrete for the first time- do not add too much water (weakens the concrete) and do not get wet concrete on bare skin- it will cause a chemical burn. Wash it off promptly if you do.

Related Questions

How to calculate how much concrete is needed for a project?

To calculate the amount of concrete needed for a project, you need to determine the volume of the area to be filled with concrete. This can be done by multiplying the length, width, and height of the area. Once you have the volume, you can then calculate the amount of concrete needed by dividing the volume by the coverage area of one cubic yard of concrete. This will give you the total number of cubic yards of concrete needed for the project.


How do you calculate the yards of concrete needed for 3570 square feet?

How thick? Gotta have thickness to calculate cubic yards.


How much concrete for 12 feet by 4.5 feet?

The depth of the pour would also be necessary to calculate the volume of concrete needed.


How do you calculate concrete?

Length in ft x Width in ft. x depth in ft. = Cubic feet, divide by 27 to get yards of concrete needed.


How do you calculate the vol of steel to a given vol of concrete?

how calculate steel in concrete


How do you calculate Concrete volume on corrugated metal decking?

You need several quantities to calculate concrete volume for corrugated metal decking. You need both the flute height in inches, flute width in inches, flute foot in inches, sealant depth or thickness in inches, gap size in inches, and deck length in feet.


How to measure how much concrete do you need for your project?

To measure how much concrete you need for your project, calculate the volume of the area to be filled with concrete by multiplying the length, width, and height. Then, divide the total volume by the yield of the concrete mix to determine the amount needed in cubic yards or cubic meters.


How many bags of concrete are needed per post?

Typically, one bag of concrete is needed per post.


How is concrete measure in units?

In the United States, if you are buying concrete mixed up and ready to pour, it is typically sold by the cubic yard (3ft x 3ft x 3ft) volume. But they usually call this just a 'yard' of concrete, knowing that it is a cubic yard.


How do you calculate the volume of concrete needed to fill a 55 gallon drum?

To calculate the volume of concrete needed to fill a 55-gallon drum, you first need to know the dimensions of the drum. Once you have the dimensions, you can use the formula for the volume of a cylinder (V = πr^2h) to calculate the volume of concrete required. Remember to convert the volume from gallons to cubic inches or feet for accurate results.


How much concrete is needed for a 4x4 post?

To calculate the amount of concrete needed for a 4x4 post, you can use the formula: volume length x width x height. For a 4x4 post, assuming a height of 8 feet, the volume would be 4 x 4 x 8 128 cubic feet. This would require approximately 1.5 cubic yards of concrete.


How many bags of concrete are needed per fence post?

Typically, one bag of concrete is needed per fence post.