It depends on which two months. July and August are 62 days. June and July are 61 days. February and March are 59 days (non-leap) or 60 days (leap).
Four months typically contain about 17 weeks and 2 days, assuming an average month length of 30 days. This can vary slightly depending on the specific months involved, as some months have 28, 30, or 31 days. However, for a rough estimate, 4 months is generally considered to be around 17 weeks and 2 days.
142 days is about 4.66 months, so you are almost halfway at about 4.54 months (138 days). 142 days is 20 weeks and 2 days left of an expected 40 week or 9.2 month pregnancy, equal to 280 days.
About 243 days. But it can be from 242 to 245 days. There is no fixed number of days in a month, and the average is 30.4 days. As 8 months is 2/3 of a Julian year, it would be 243.5 days on average.
How many days in 8 months
100 days equals 3 months and several days, the exact number of days depending on which months are involved.
I assume you mean months which about 2 months are in 60 days. If not 60 days are in 2 months. Then maybe its in 3 months in a half
Anything from 2 months + 6 days to exactly 2 months - depending on which months are picked.
84 days is about 2¾ months. (2.75 average months, 2 months and 23 days). There is no fixed number of days in a month, but the average is 30.4 days a month.
About 2.4 months, as months average 30.4 days (they are not a fixed length). This is about 2 months and 13 days.
About 2 months.
72 days is approximately 2 1/3 months.
70 days is about 2 months plus 9 to 11 days, or about 2.3 average months of 30.4 days. A month can vary from 28 to 31 days.
2
60days
If the months are 31 days long, then there are 3,694,7200 seconds
about 6 1/2 months.
Near enough 2 months. Although 2 months can also be 59, 61 or 62 days.