You will need a minimum of 18.96 cubic yards.
A minimum of 5.93 cubic yards is needed.
0.86 cubic yards is needed.
At 4" thick you would need at least 7.04 cubic yards. At 6" thick you'll need at least 10.56 cubic yards. If the slab is 2" thick, you'll need 3.52cubic yards.
For this area you will need 2.4 cubic yards.
9.3 cubic yards of cement is required for this slab.
1.85 cubic yards of cement.
5.93 cubic yards.
A 16' x 8' by 4" slab requires 3.56 cubic yards of cement.
A minimum of 5.93 cubic yards is needed.
0.86 cubic yards is needed.
At 4" thick you would need at least 7.04 cubic yards. At 6" thick you'll need at least 10.56 cubic yards. If the slab is 2" thick, you'll need 3.52cubic yards.
At 8" thick, you will need at least 4.67 cubic yards.
For this area you will need 2.4 cubic yards.
You'll need a minimum of 1.85 cubic yards for that size.
about 25 yds
9.3 cubic yards of cement is required for this slab.
You will need at least 9.68 cubic yards of cement.