14.81 yds
2.15
you can do the math: LXWXD DIVIDED BY 27
625 times 0.5 = 312.5 cubic feet will be needed
how many cubic feet in a yard of concret
To calculate the volume of concrete needed for a slab, you can use the formula: Volume = Area × Thickness. First, convert the thickness from inches to feet: 4 inches is 1/3 feet. Then, multiply the area (256 square feet) by the thickness (1/3 feet): 256 × (1/3) = approximately 85.33 cubic feet of concrete is needed for the slab.
2.15
you can do the math: LXWXD DIVIDED BY 27
625 times 0.5 = 312.5 cubic feet will be needed
how many cubic feet in a yard of concret
A 9x9 foot slab 4 inches thick requires a minimum of 1 cubic yard. If you go to 6 inches thick you will need 1.5 cubic yards.
To calculate the volume of concrete needed for a slab, you can use the formula: Volume = Area × Thickness. First, convert the thickness from inches to feet: 4 inches is 1/3 feet. Then, multiply the area (256 square feet) by the thickness (1/3 feet): 256 × (1/3) = approximately 85.33 cubic feet of concrete is needed for the slab.
A cubic yard is 46,656 cubic inches. Spread to a thicknes of 5 inches, a cubic yard of concrete covers 9332.1 square inches, which is 64.8 square feet.
About 162sf.
81
Allow 5.5 to 6 yards. Always allow for wastage, underrunning forms, etc.
go to any search. and type in concrete calculater
1000 square feet/9 = 111.1 square yards of concrete 6 inches thick. This is the same as 111.1/4.5 = 24.7 cubic yards of concrete.