answersLogoWhite

0

The labor required to spread a ton of gravel depends on several factors, including the area size, the method of spreading, and the terrain conditions. Typically, a skilled worker can spread about 1 ton of gravel in 1 to 2 hours using a shovel and rake, while mechanical methods like a skid steer or tractor can significantly reduce this time to around 20-30 minutes. Additionally, uneven terrain or obstacles may increase the labor time. Planning and preparation can also affect overall efficiency.

User Avatar

AnswerBot

3mo ago

What else can I help you with?

Related Questions

How much sand clay gravel and humus does it take to make soil?

25%-sand 255-clay 25%-gravel 25%-humus


How much gravel wouldd it take to cover a 20 feet X 30 feet parking lot at 3in deep?

5.55 cubic yards of gravel


How much gravel will it take to cover 3100 square feet at 3 inches deep?

You'll need about 28.704 cubic yards (37 tons) of gravel.


How much Labor times for changing water pump on 07 impala?

how much labor time does it take to change the water pump on an 07 impala


How much gravel will it take to fill a 7x10 pad 8 deep?

23 cu. ft., or about 1 cu. yd.


How much labor does it take to replace 2000 Chevy Malibu alternator?

It should take less than an hour.


How much yarn does it take to make a bed spread on a serenity loom?

10 ounces


How much gravel wouldd it take to cover a 20 feet X 50 feet parking lot at 4in deep?

that is 333 cubic feet,or 12.3 cubic yards At 100 pounds per cubic foot,that is over 33,000 pounds of gravel


Does gases take up a lot of space?

Gasses spread out to take up as much space as they can but it really depends on the amount of gas.


How to properly dispose of gravel?

To properly dispose of gravel, you can either reuse it in landscaping projects or take it to a local landfill or recycling center. Make sure to check with your local waste management facility for specific guidelines on disposing of gravel.


How much does it cost for labor to install a clutch slave cylinder on a 1998 s10?

How much labor will cost a person in order to install a clutch slave cylinder on a 1998 S10 will depend upon how much labor charges are. It should take a mechanic no longer than 30 minutes in order to install the clutch slave cylinder.


What would cause a red eared sliders back feet to bleed?

If you have sharp or jagged rocks or gravel at the bottom of your tank could be rubbing out on turtle's legs. I suggest that you put some smoother gravel in or just take out the gravel or rocks!