If a project can be compared to the life cycle of a human, then humans need different things during their life. Very basically, as babies we need nurturing, as we grow we are educated, then we can get jobs and then we retire. During each of these cycles our inputs and outputs are different. from a project point of view, failure to understand this will mean you will either be using the wrong type of resources, stay in a cycle too long (i.e. expending both times and resources unnecessarily), don't have clean hand-overs (i.e. again wasting effort) between life cycles, or as a lot of projects tend to do just go on and on expending/wasting resources that could be far more usefully deployed on other projects. Having clear and well defined understanding of what cycle you are in, brings focus to a project in order to get you to the next phase or to the delivery point and ultimately the support and close out phase.
You will be able to deal with projects in a logical manner. You will understand the framework for your project.
In software engineering, the software development life cycle (SDLC), is a process for planning, creating, testing, and deploying an information system. The systems development life cycle concept applies to a range of hardware and software configurations, as a system can be composed of hardware only, software only, or a combination of both. There are usually six stages in this cycle: requirement analysis, design, development and testing, implementation, documentation, and evaluation.
Unfortunately this is not true. Every project has an end and every project life cycle has an end too. The last phase of any projects life cycle is the project closure/closing phase where the project is wrapped up and closed.
the concept is very simple to understand. By Moksha (liberation) we can break the cycle of life and death
1. Uniqueness - every project has unique elements (no two projects are the same) 2. Complexity and Interdependencies - projects often have subtasks that require careful coordination and control in terms of timing, precedence, cost, and performance 3. Life Cycle - all projects have a life cycle (beginning, build in size, peak, decline and must be terminated)
I would say the "Planning" phase is the most important in a projects life cycle because a project that isnt properly planned has around 99% chances of failure.
it is a life cycle to them or their life.
A project manager needs to understand both to be able to analyze and distinguish the difference and the appropriate time to use either.
the life cycle for horses are for all breeds. it is a dumb life cycle
cougars life cycle === ===
what is the wetas life cycle
what is a plums life cycle