answersLogoWhite

0


Best Answer

It is possible for curing concrete to produce VOCs, or volatile organic compounds, which contain harmful gases. This can happen if the concrete is cured using a toxic chemical compound. The toxicity of the gas has shown to wear off after 28 days.

User Avatar

Wiki User

10y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Does curing concrete produce any kind of gas?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Why and how would you extend the curing process of the concrete?

Placing plastic sheeting (known as visquene in construction trades) over drying concrete extends the curing process of concrete. The idea is to slow the evaporation of moisture from the drying concrete. The slower concrete curing process, the stronger the concrete becomes. On construction jobs I have been party to, the curing concrete is usually covered for two or three days.If the curing concrete's surface were to get dry, there may not be enough water for the chemical reaction which forms concrete, and so the surface would not be as strong. Wetting isn't about "extending" but rather allowing the curing to make a hard surface. The full curing takes as long as a month to reach full strength, but most of the reaction happens in three days.If you actually want it slower, then cooling would work, as with any chemical reaction. Also disrupting the water-cement reaction would work, which would unfortunately make the concrete weaker. For example, adding sugar or anything that ties up the water would slow the reaction but harm the strength of the result.


What kind of food Egyptians eat?

egyptians ate meat and any kind of produce


What is the difference between cement and concrete?

Concrete is made from cement. Concrete has cement, rock and sand mixed with water. Cement is just the powdered hydrated limestone.Cement is a building material that is a powder made of a mixture of calcined limestone ( calcined: to Heat a substance so that it oxidizes or reduces) and clay; when cement is used with water and sand or gravel it makes what is referred to as concrete or mortar.Reinforced concrete means that there is a mat of rebar (iron rods) metal, and/or mesh added to provide extra support against stresses and is laid out prior to the pour of concrete.Grout is a thin mortar that can be poured and used to fill cracks in masonry, ceramic tile or brickwork.regular curingIt is critical to concrete's long-term durability that it be kept as moist as possible for the first seven days after placement. In addition, it must be allowed sufficient drying time before being subjected to freezing temperatures or to de-icing salts. Curing concrete properly requires the correct control of moisture and temperature and without proper curing, concrete may only achieve 50% of its potential design strength. The logic behind the practice of a seven day curing period rests on two facts:Cement, the "active" ingredient in concrete requires constant moisture to gain strength.If the concrete is kept moist for the seven day period, it will not only gain strength, but will also shrink less and produce fewer cracks.Curing can be assisted in a number of ways:Spray-on liquid curing agents and sealers.Water ponding or spraying a mist over the concrete.Coverings such as wet burlap, polyethylene, insulating blankets, etc.Leave forms in place.A liquid curing agent is the most effective and convenient method. The curing agent should be applied as soon as finishing is complete. Curing agents form a membrane on the surface of the concrete in order to retain moisture. Once the curing agent has been applied, no further working of the concrete can be done. Use a spray or roller to apply curing agents.According to CSA A23.1-94, curing is a mandatory part of concrete construction and requires moisture to maintain the concrete at 100% relative humidity and a minimum temperature of 10°C for a period of at least 3 days. This period is extended to a minimum of 7 days for the durability requirements of exposure classes F1, C1, C2, S1, and S2.cold curingConcrete can be placed safely throughout the colder months if precautions are taken. During colder weather, the mix should be adapted to the ambient temperature by heating the concrete, adding accelerators, and providing protection. during colder condition's, it is important to heat all concrete to meet the requirements of CSA and to maintain reasonable setting times and strength gain.Concrete generates heat during the hydration process, (the chemical process by which cement reacts with water to form a hard stable paste). Hydration is affected by initial concrete temperature, ambient air temperature, the dimensions of the concrete and mix design.The temperature of the concrete during and after placement is critical since concrete sets more slowly as the temperature drops. Finishing and form removal may be delayed in cool weather and strength development can be impaired if appropriate precautions are not taken.whenever possible , if not always, do not place concrete on frozen ground, on snow, or in freezing weather. If concrete freezes while in a saturated condition, surface problems like scaling, spalling or cracking can arise due to the expansion and contraction of frozen water inside the concrete.During freezing weather, water curing of concrete should be terminated 12 hours before the end of the protection period.Do not use a curing agent if there is any chance that the concrete will freeze during the curing period.Protect concrete from freezing temperatures for 3 to 7 days after placing.Leave forms in place as long as possible. Corners and edges are most vulnerable (cover and heat if necessary).Protect flatwork by covering and heating, or using insulated blankets, or covering with plastic and straw.This information has been provided to assist you .For a complete review of cold weather concrete practices, please refer to CSA A23.1 -- 94 Section 21.


Is it ok to paint uncured concrete?

No, it is not OK. Doing that may inhibit the curing. I always leave concrete for 2 weeks before painting, You should wait to paint until the pH is below 10. Sometimes this can take up to two months. You can get pH strips at any drug store.


What kind of animal does not produce much internal heat?

Cold-blooded animals do not produce much body heat. Most do not produce any at all.


What kind of noun is teacher?

The noun 'teacher' is a singular, common, concrete noun; a word for a person.It is a singular noun because it is a word for one person.It is a concrete noun because a teacher is a physical person.It is a common noun because it is a general word for any teacher of any kind.


What is fuel?

Any kind of material or gas that produce energy during its combustion.


Is there any kind of fungus that produces flowers?

Fungi do not produce flowers, they produce fruiting bodies known as mushrooms or toadstools.


What kind of compressor used in pneumatic drilling machine?

Any kind that will produce adequate pressure and volume of air.


What organisms have plant cells?

Any kind of plant that can produce glucose and oxygen in photosynthesis.


Can you treat jock itch with apple cider vinegar?

tinactin or any kind of antifungal cream or medication will cure you. Curing a fungus requires an antifungal agent! hope this helps!


What kinds of foods did Egyptians eat?

tutti