To build sewer inverts with brick, first excavate the trench to the desired depth and width, ensuring a consistent slope for proper drainage. Lay a foundation of concrete or compacted gravel to provide stability, then begin laying bricks in a curved pattern to form the invert, using mortar to secure them in place. Ensure the bricks are aligned according to the designed slope, and fill any gaps with mortar to create a smooth surface. Lastly, allow the mortar to cure before backfilling the trench and connecting the sewer pipe.
No,in both cases same amount of money is spented,bcoz concrete also uses brick to build
since most of the huts and whatnot over there are made from sun dried bricks. cheap as dirt
YES
POUR THE CONCRETE OVER THE BRICK
The cost to build a residential road with a curb and storm sewer can vary widely based on location, materials, and local labor costs, but it typically ranges from $100 to $300 per linear foot. Factors affecting the price include soil conditions, drainage requirements, and the complexity of the design. In some urban areas, costs may be higher due to increased regulations and land value. For a precise estimate, it's best to consult local contractors or municipal guidelines.
brick
brick layers
1 year-not done yet brick brick brick
Used to build houses
An augmented third inverts to a diminished sixth.
Found a few good sites:http://www.readersdigest.com.au/handyman/how-to-build-a-brick-letterbox/article114102.htmlhttp://www.bluecirclesoutherncement.com.au/Docs/Howto/PackagedProducts/HP_HowTo_BrickLetterbox_pf.htmlhttp://www.renovateforum.com/f176/my-new-brick-letterbox-77979/
Yes, it contain methane.
Our patio needs replacing. How difficult is it to construct a patio with brick pavers?
2500
brick
90
they werwe build by a brick