An asphalt road is constructed through several key steps. First, the existing surface is cleared and graded to ensure proper drainage and a stable foundation. Next, a base layer of crushed stone or gravel is laid and compacted, followed by a binder layer of asphalt. Finally, the surface layer of hot asphalt mix is applied, compacted, and smoothed to create a durable, weather-resistant road surface.

User Avatar

AnswerBot

3mo ago

What else can I help you with?

Related Questions

When was the first asphalt road made?

The first asphalt road was constructed in 1824 in Paris, France, by engineer Pierre-Marie-Jérôme Tranchant. This innovative use of asphalt for paving roads marked a significant advancement in road construction. However, it wasn't until the late 19th century that asphalt became widely used for paving roads, particularly with the development of the first modern asphalt pavement in the United States in the 1870s.


Is an asphalt road homogenous or heterogenous?

An asphalt road is considered heterogeneous. This is because the asphalt in the road is not uniform or constant in structure.


What is difference between road tar and asphalt?

Road tar is made from coal. Asphalt is a heavy fraction of petroleum.


What is asphalt covered road called?

A paved road. Metalled road.


What is the road made out of?

ROADS ARE MADE OF ASPHALT.


What is ashpalt?

Asphalt is made out of gravel or sand. Asphalt is usually used to pave a road. Asphalt can also be used in roofing a house or making certain flooring.


What materials are needed for asphalt road construction?

Asphalt road construction primarily requires asphalt binder, which is a petroleum product, and aggregate materials such as crushed stone, gravel, or sand. Additionally, additives may be used to enhance the performance of the asphalt mix, including polymers or recycled materials. Equipment for mixing, laying, and compacting the asphalt, such as asphalt pavers and rollers, is also essential for the construction process.


What is the road made of on race tracks?

Concrete or asphalt depending on the track.


How is the process of preparing and pouring asphalt for road construction carried out?

The process of preparing and pouring asphalt for road construction involves several steps. First, the area where the asphalt will be laid is cleared of any debris and leveled. Then, a layer of gravel or sand is laid down as a base. Next, the asphalt mixture is heated in a specialized truck and transported to the site. The hot asphalt is then poured and spread evenly using a paving machine. Finally, the asphalt is compacted using a roller to ensure a smooth and durable surface for the road.


Who is credited with inventing modern road asphalt?

The inventer of the modern road was John Loudon McAdam.


Ingredient of road pavment?

Most roads are paved with asphalt.


What does ac mean when talking road construction?

Asphalt Concrete