To determine how much concrete is needed for an 8x8 area, you first need to know the thickness of the concrete slab. If, for example, the slab is 4 inches thick, you would convert the dimensions into feet (8 feet x 8 feet) and the thickness into feet (4 inches = 1/3 feet). The volume in cubic feet would be 8 x 8 x (1/3) = approximately 21.33 cubic feet. To convert this to cubic yards (since concrete is often sold by the cubic yard), divide by 27, resulting in about 0.79 cubic yards of concrete needed.
To determine how much concrete you need for a footpath, first calculate the area by multiplying the length by the width of the path. Then, multiply the area by the desired thickness of the concrete (typically 4-6 inches for footpaths). Convert all measurements to the same units (e.g., feet) and remember that one cubic yard of concrete covers about 81 square feet at a thickness of 4 inches. This calculation will give you the total volume of concrete required.
That is an area measurement, whereas concrete is measured in volume, typically cubic yards in the US. The costs vary widely based on local availiblity of materials and the type of concrete mix. The national average is about $100 for a cubic yard of concrete.
form_title= Concrete Sealer form_header= Seal all the projects in your home with concrete sealer. What is the sealer for?*= _ [50] How much sealer do you need?*= _ [50] Have you ever used sealer?*= () Yes () No
The cost of an 8 by 8 meter concrete slab can vary widely depending on factors such as location, labor costs, and materials. On average, the cost can range from $75 to $150 per cubic meter of concrete, plus additional expenses for labor and preparation. For an 8x8 meter slab that is 10 cm thick, the total cost could range from approximately $600 to $1,200 or more. It's best to get specific quotes from local contractors for an accurate estimate.
how much does concrete cost per square foot
It depends on how thick you want the concrete.
This is an extremely confused question! There is no such thing as an 8x8 circle. Furthermore, if the 8x8 refers to an area then there can be no linear feet "in" it. A linear foot is a measure of distance and, according to the basic principles of dimensional analysis, conversion from an area to a linear measure is not valid.
18 bags (80 pounds) of quikrete for a 4 inch thick slab.
Since you do LxW, 8x8=64
96 cubic feet of concrete
Concrete is usually reinforced by adding steel. The cost of reinforcing concrete depends with the given area under which the steel is placed to reinforce it.
9x7 and 7x9 are the same and equals to 63 whereas 8x8 equals to 64 so therefore 8x8 is greater than both 9x7 and 7x9.
To calculate the amount of concrete needed for a project, you need to determine the volume of the area to be filled with concrete. This can be done by multiplying the length, width, and height of the area. Once you have the volume, you can then calculate the amount of concrete needed by dividing the volume by the coverage area of one cubic yard of concrete. This will give you the total number of cubic yards of concrete needed for the project.
2kg
54sqare feet
Triangle area: bh/2 8x8/2=64/2=32(cm2)
an 8x8 envelope is charged "parcel rate"..because it is square and over the letter size dimension...cant be a "large envelope" because it is not rectangular