14.8 cub yds Call 15 cub yds. regret Istill work in old numbers.
If I was 50 years younger I would help you lay it.
If you have laid a foundation fairly deep and haven't 'dialed b4 you dig" you might have hit a pipe, if not try removing the joins and finding the source of the problem once the concrete has dried
To repair a crack in a concrete slab, first clean the crack thoroughly by removing any loose debris or dust. If the crack is wider than 1/4 inch, fill it with a concrete repair caulk or epoxy filler, ensuring it penetrates deep into the crack. For smaller cracks, a concrete resurfacer or patching compound can be applied. Finally, smooth the surface and allow it to cure according to the manufacturer's instructions.
A yard of Concrete is 3ft x 3ft x 3ft volume. It is usually poured over a 2" gravel sand mix for an additional four inches. So it should cover 36 "/4" = 9 (x 3ft x 3ft), or 81sq ft.The 'square feet' of area that it covers is 324/(depth of the concrete, in inches)
if reinforcement is provided in tension zone in a beam, then that beam is called singly reinforced beam.if the reinforcement is provided in top & bottom of the beam i.e., at tension zone as well as compression zone also then that beam is called doubly reinforced beam.
48"
Essentially, you need three and a third cubic yards of concrete to replace that quantity to those measurements - so if the cost of a cubic yard of concrete is 30, multiply it by 3.333 and you get 100
87.5 cubic feet
How deep do you want the concrete to be?
96 cubic feet of concrete
There is no way to answer that without knowing how deep the concrete will be.
0.246914 cu. yards (6.666667 cu. ft ) of concrete is needed.
If you have laid a foundation fairly deep and haven't 'dialed b4 you dig" you might have hit a pipe, if not try removing the joins and finding the source of the problem once the concrete has dried
3880 cubic yards
You will need 65.93 cubic yards or 84.6 tons of gravel.
147 cubic feet of cement are required.
40.1 cubic yards
16.05