The main disadvantage of compacting concrete using a cement vibrator is the noise. The advantages of compacting concrete using a cement vibrator is to remove trapped air and excess water which then allows the concrete settle firmly.
To form concrete effectively for construction projects, follow these steps: Prepare the site by leveling and compacting the ground. Build sturdy forms using wood or metal to contain the concrete. Place reinforcement such as rebar or wire mesh within the forms. Mix the concrete ingredients thoroughly and pour into the forms. Use a vibrator to remove air bubbles and ensure proper compaction. Finish the surface with a trowel for a smooth and level finish. Allow the concrete to cure properly before removing the forms.
It is around 0.5 litres/hour depending on the operator.
100 cubic meters.
no a vibrator vibrates. A vibrator is more recommended.
her vibrator ;)
Process In this system, concrete is poured in place & vibrated with a poker vibrator. Then a screed vibrator is run over the surface, supported on channel shuttering spaced 4.0 meters apart. The screed vibrator is run twice to achieve optimum compaction & leveling. After this a system of lower mats & top mat is laid on the green concrete & this is attached to a vacuum pump. This draws out excess water.Benefits 1. Compressive strength of floor increases by upto 60% 2. Tensile strength increases by @ 70% 3. Cement consumption is reduced to the extent of 40%, no cement is required separately for finishing the surface. 4. Abrasion resistance of the floor increases by @ 60% resulting in les wear and rear of the floor surface 5. Shrinkage of concrete is reduced and floor wraps less.
a vibrator
VDF Flooring also known as Vacuum Dewatered Flooring is a special type of Flooring Technique to achieve High Strength, Longer Life, Better Finish and Faster Work. This type of floor is suitable for high abrasion & heavy traffic movement. In this system, concrete is poured in place & vibrated with a poker vibrator. Then a screed vibrator is run over the surface, supported on channel shuttering spaced 4.0 meters apart. The screed vibrator is run twice to achieve optimum compaction & levelling. After this a system of lower mats & top mat is laid on the green concrete & this is attached to a vacuum pump. This draws out excess water. The concrete is left to stiffen. When the base concrete has stiffened to the point when light foot traffic leaves an imprint of about 3-6 mm,a suitable Floor Hardener should be applied at an even application rate of between 3-5 Kg/Sqmt.  Any bleed water should now have evaporated, but the concrete should have a wet sheen. The concrete is then furt her compacted and levelled using Power Floater followed by finishing as per the requirement using Power Trowel.
6'' thick sand filling, then 9'' thick plain cement concrete 1:4:8 [ ratio] then top layer of Plain cement concrete 1:1.5:3 mixed with concrete mixer. proper vibrator should be used. expansion joint should be after 2.5mts to 3mts alternatively of 12 mm wide and filled with the mixer of hot bitumen sand mixed. by: m.s.chaudhary [civil engineer]
your moms vibrator
electric vibrator!
the Pocket Vibrator