answersLogoWhite

0

What else can I help you with?

Continue Learning about Civil Engineering

What is the role of project management in construction for?

The role and job of project management in construction is for managing a construction project. Project management jobs help organize the construction and the people needed to make the construction.


What do people build to control the flooding along Huang river?

To control flooding along the Huang River, people have built a series of dams, levees, and flood control channels. The most notable structure is the Three Gorges Dam, which helps manage water flow and reduce the risk of flooding. Additionally, extensive levee systems have been constructed to protect agricultural land and urban areas from floodwaters. These measures aim to mitigate the impact of seasonal flooding and enhance water management in the region.


What are the advantages of pipe culverts?

Pipe culverts offer several advantages, including ease of installation, cost-effectiveness, and versatility in various applications such as drainage and water flow management. Their lightweight design allows for simpler handling and quicker installation compared to other structures, such as box culverts. Additionally, pipe culverts can accommodate different types of materials and sizes, making them suitable for various site conditions and hydraulic requirements. Lastly, their streamlined shape often promotes efficient water flow and reduces the risk of blockages.


What are the technical competencies within the major contracting phases of contract planning formation and administration?

The major contracting phases—contract planning, formation, and administration—require specific technical competencies. In contract planning, competencies include market analysis, risk assessment, and understanding regulatory requirements. During contract formation, skills in negotiation, drafting, and legal compliance are essential to create enforceable agreements. Finally, in contract administration, expertise in performance monitoring, financial management, and conflict resolution ensures effective contract execution and compliance throughout its lifecycle.


What is unclassified site excavation?

In construction the term "unclassified" means the site contractor/GC is responsible for the onsite material. An unclassified site contract puts a great deal of risk on the contractor but is much more costly for the owner of the land.

Related Questions

What is DA Civilian primary reference for risk management?

000


Is a DA Civilian and primary reference for risk management?

A DA Civilian, or Department of the Army Civilian, can be a primary reference for risk management within the context of Army operations, as they often possess specialized knowledge and skills in areas like logistics, safety, and compliance. However, risk management typically involves a collaborative approach, incorporating input from various stakeholders, including military personnel and other experts. The effectiveness of a DA Civilian in this role will depend on their specific expertise and experience in risk assessment methodologies.


What DA Civilians primary reference for risk management?

000


WHAT ARE ANSWERS TO THE Risk Management Civilian Basic Course?

Risk Management Civilian Basic Course Exam


Is a DA Civilians primary reference for risk management?

DA Pam 385-30


What is a DA Civilians primary reference for risk management?

000


What has the author Wilfrid Treasure written?

Wilfrid Treasure has written: 'Diagnosis and risk management in primary care' -- subject(s): Methods, Risk management, Primary health care, Risk Management, Diagnostic Techniques and Procedures, Diagnosis, Primary Health Care, Primary care (Medicine)


What are the two levels of air force risk management?

what are the two primary levels of air force risk management


What are the two primary risk levels of the air force risk management?

strategic and tactical


What are two primary levels of risk management?

stratigic and operational


What the are the two primary levels of risk management?

stratigic and operational


What are the two primary levels of the the air force risk management?

real-time management is used: