Continue Learning about Civil Engineering

Why does not use other material instead of steel for concrete work?

Because of the thermal compactablity of the steel the material is used in concrete


What is disaggregation of concrete?

Disaggregation of concrete refers to the process of breaking down concrete into its constituent materials, such as cement, aggregates, and water. This can occur naturally over time due to environmental factors like weathering, or it can be a deliberate action for recycling purposes. Disaggregated concrete can be reused as a base material for new concrete, thus promoting sustainability and reducing waste in construction. Additionally, understanding disaggregation helps in assessing the durability and longevity of existing concrete structures.


Where can you dump concrete?

You can dump concrete at designated construction and demolition waste disposal sites, which are often managed by local waste management facilities. Some municipalities also have specific recycling centers that accept concrete for reuse in new construction projects. Always check local regulations and guidelines to ensure compliance, as improper dumping can lead to fines and environmental issues. Additionally, some companies may offer services to recycle concrete directly on-site.


What is more fire resistant steel or concrete?

Concrete is much more fire resistant. This is shown by the design of reinforced concrete structure where the steel is placed within the concrete. A major reason is that the concrete protects the steel from any fire. Steel only construction requires the steel to be covered in a fire protection material.


What material and in what quantity would you need to construct a concrete footpath 100m long?

To construct a concrete footpath that is 100 meters long, you would typically need to determine the width and thickness of the path. For example, if the path is 1 meter wide and 10 cm (0.1 meters) thick, you would need 10 cubic meters of concrete (100m x 1m x 0.1m = 10m³). To account for waste and variations, it's advisable to order about 10-15% more concrete, so approximately 11-12 cubic meters would be ideal.