€12 per square metre for scud scratch and float

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

What is the cement render mix for outside walls?

one part cement to four parts of sharp sand


How much cement sand and stone do you need for 1 cubic meter of concrete?

How much cement sand and stone do you need for 1 cubic meter of concre


How much sand and cement needed to render 11m2 wall?

To render an 11m² wall, you'll typically need about 2-3 bags of cement (25kg each) and approximately 0.5-0.75 cubic meters of sand, depending on the thickness of the render and the specific mix ratio used. A common mix ratio for rendering is 1 part cement to 4-5 parts sand. It's essential to adjust these quantities based on the desired finish and application technique. Always check specific product recommendations for the best results.


What is the volume of sand in 1 cubic meter of concrete?

Concrete is a mixture of cement, sand, stone, and water. In a cuibic meter of concrete, , there is about 0.3 cubic meters of sand, or about 475 kg


How much does a 50kg bag of cement cost in South Africa?

how much does a bag of cement and 1 ton of building sand cost in south Africa


How many kilos equal 1 cubic meter sand cement?

assuming kilos means kilograms. In that case, there is no definite answer. Kilograms are units of mass and ite dpends on the consistency (or density) of the cement mixture. A cubic meter of cement can have various densities.


How many bag of cement and sand per square meter at 8 inches thick concrete slab?

6


How much sand and aggregate required 1 cubic meter of M30 grade cement?

Type your answer here... 11.2


Can you use a normal render mix 1 part lime 1 part cement 6 parts sand on osb boards?

I have seen it done this way on small jobs.


How many bags of sand in 1 cubic meter?

The density of sand can vary, but a common value is around 1,600 kg/m^3. Assuming this density, 1 cubic meter of sand would weigh 1,600 kg. If a bag of sand typically weighs around 20 kg, you would need 80 bags of sand to fill 1 cubic meter.


How many bricks required in 1 cubic meter of brick work and how many cement and sand?

The number of bricks required for 1 cubic meter of brickwork typically ranges from 500 to 550 bricks, depending on the size of the bricks and the mortar joint thickness. For the mortar mix, a common ratio is 1 part cement to 6 parts sand, which would require approximately 0.3 cubic meters of sand and about 0.05 cubic meters of cement for 1 cubic meter of brickwork. This can vary based on the specific mix design and construction practices used.


How many sand water and cement goes in the concrete mix?

sand=2*Weight of Cement water=cement/2