€12 per square metre for scud scratch and float
one part cement to four parts of sharp sand
To render an 11m² wall, you'll typically need about 2-3 bags of cement (25kg each) and approximately 0.5-0.75 cubic meters of sand, depending on the thickness of the render and the specific mix ratio used. A common mix ratio for rendering is 1 part cement to 4-5 parts sand. It's essential to adjust these quantities based on the desired finish and application technique. Always check specific product recommendations for the best results.
in asphalt and cement concrete. We can use sand ,cement and water as a mixture of mortar.
Hello, I'm getting my pavers for good price about $1.37 sqft, but dont forget the cost of the labor and the gravel sand cement.
Concrete actually contains cement as well as sand and gravel. We say "cement concrete" because cement is an ingredient in concrete. And because the cement is what binds together the sand and gravel that make up the concrete.
one part cement to four parts of sharp sand
How much cement sand and stone do you need for 1 cubic meter of concre
To render an 11m² wall, you'll typically need about 2-3 bags of cement (25kg each) and approximately 0.5-0.75 cubic meters of sand, depending on the thickness of the render and the specific mix ratio used. A common mix ratio for rendering is 1 part cement to 4-5 parts sand. It's essential to adjust these quantities based on the desired finish and application technique. Always check specific product recommendations for the best results.
Concrete is a mixture of cement, sand, stone, and water. In a cuibic meter of concrete, , there is about 0.3 cubic meters of sand, or about 475 kg
how much does a bag of cement and 1 ton of building sand cost in south Africa
assuming kilos means kilograms. In that case, there is no definite answer. Kilograms are units of mass and ite dpends on the consistency (or density) of the cement mixture. A cubic meter of cement can have various densities.
6
Type your answer here... 11.2
I have seen it done this way on small jobs.
The density of sand can vary, but a common value is around 1,600 kg/m^3. Assuming this density, 1 cubic meter of sand would weigh 1,600 kg. If a bag of sand typically weighs around 20 kg, you would need 80 bags of sand to fill 1 cubic meter.
The number of bricks required for 1 cubic meter of brickwork typically ranges from 500 to 550 bricks, depending on the size of the bricks and the mortar joint thickness. For the mortar mix, a common ratio is 1 part cement to 6 parts sand, which would require approximately 0.3 cubic meters of sand and about 0.05 cubic meters of cement for 1 cubic meter of brickwork. This can vary based on the specific mix design and construction practices used.
sand=2*Weight of Cement water=cement/2