just simple 10 m x 10 m x 0.003 m = 0.3 cum
then convert it into bags and its = 9 bag appx.
About 10-25 % by weight of ashes can be used in cement.Ash is generally a replacement material in cement.Some of the ashes addes in cement are volcanic ashes, fly ashes, blast furnace slags.
It takes at least 10-25 minutes to be dry on the surface but at least an hour for it to be fully dry
The coverage rate for cement-sand mortar used in rendering typically ranges from 12 to 15 square meters per bag of cement (approximately 25 kg) when applied at a thickness of about 10 mm. This rate can vary based on factors such as the texture of the surface, the skill of the applicator, and the specific mix design of the mortar. It's important to consider these variables for accurate calculations.
m15- 6.25 m20 - 6.8 m25 - 7.5 m30- 8.5 m35- 9 m40 - 10
To lay 65 square meters of concrete, the amount of sand and cement required depends on the thickness of the concrete layer. For a typical thickness of 10 cm, you would need approximately 0.65 cubic meters of concrete. A common mix ratio is 1 part cement to 2 parts sand to 3 parts gravel. In this case, you would need about 130 kg of cement and around 0.26 cubic meters of sand. Adjustments may be necessary based on the specific mix design and project requirements.
which are top 100 cement companies in the world
Operation Repo - 2007 Cement Mixer 10-10 was released on: USA: 9 April 2012
The percent decrease is calculated by taking the difference between the original quantity and the new quantity, dividing it by the original quantity, and then multiplying by 100. In this case, the percent decrease would be (10 - 3) / 10 * 100 = 70%.
when we test the cement with the help of Le-Chatlier apparatus and then we found if the expansion is more than 10 mm then the cement is said to be unsoundness
Divide it by 10
Bump in the Night - 1994 Neat and Clean Nothing But the Tooth 2-10 was released on: USA: 1995
The colour of cement is Grey.The grey colour is due to the presence of iron oxide.The coloured cement consists of portland cement with 5-10% pigment.White cement - pure limestone + china claychromium oxide - greencobalt - blue
The percentage increase form 10 to 13 is 30%
To calculate the cubic feet of cement needed for a volume of 10 feet by 10 feet by 4 feet, you multiply the dimensions: 10 x 10 x 4 = 400 cubic feet. Therefore, you would need 400 cubic feet of cement for that volume.
20' by 26' by 5" requires at least 10 cubic yards of cement.
CEMEX
No. For example, 500 increased by 10% = 550 Now, decreasing 550 by 10% results in: 495, not 500.